Drainage pipeline structure and construction method thereof
The invention relates to a drainage pipeline structure. The drainage pipeline structure comprises a prefabricated base, a corrugated pipe and a limit rack. The corrugated pipe is located in a containing cavity, and a gap between the corrugated pipe and the containing cavity is filled with a lower protection pipe concrete body. The limit rack and a side plate are fixedly arranged, the limit rack islocated on the upper portion of the corrugated pipe, and an upper protection pipe concrete body with the limit rack as a framework covers the upper portion of the corrugated pipe. The invention further relates to a construction method. The construction method comprises the steps of S1, measurement and paying off; S2, digging of grooves; S3, construction of a base gravel pad layer; S4, installation of the base; S5, installation of the corrugated pipe; S6, installation of the limit rack; S7, pouring of lower protection pipe concrete; S8, pouring of upper protection pipe concrete; S9, back filling of the grooves. The drainage pipeline structure can improve the structural strength and bearing capacity of the corrugated pipe.
本申请涉及一种排水管道结构,包括预制成型的基座、波纹管道和限位架;所述波纹管道位于所述容纳腔内,且所述波纹管道与所述容纳腔之间的间隙填充有下护管混凝土体;所述限位架与所述侧板固定设置,所述限位架位于所述波纹管道的上部,且波纹管道上部覆盖有以所述限位架为骨架的上护管混凝土体;本申请还涉及一种施工方法,包括S1测量放线、S2沟槽开挖、S3基础碎石垫层施工、S4基座安装、S5波纹管道安装、S6限位架安装、S7浇筑下护管混凝土、S8浇筑上护管混凝土、S9沟槽回填;本申请能够提高波纹管道的结构强度和承载能力。
Drainage pipeline structure and construction method thereof
The invention relates to a drainage pipeline structure. The drainage pipeline structure comprises a prefabricated base, a corrugated pipe and a limit rack. The corrugated pipe is located in a containing cavity, and a gap between the corrugated pipe and the containing cavity is filled with a lower protection pipe concrete body. The limit rack and a side plate are fixedly arranged, the limit rack islocated on the upper portion of the corrugated pipe, and an upper protection pipe concrete body with the limit rack as a framework covers the upper portion of the corrugated pipe. The invention further relates to a construction method. The construction method comprises the steps of S1, measurement and paying off; S2, digging of grooves; S3, construction of a base gravel pad layer; S4, installation of the base; S5, installation of the corrugated pipe; S6, installation of the limit rack; S7, pouring of lower protection pipe concrete; S8, pouring of upper protection pipe concrete; S9, back filling of the grooves. The drainage pipeline structure can improve the structural strength and bearing capacity of the corrugated pipe.
本申请涉及一种排水管道结构,包括预制成型的基座、波纹管道和限位架;所述波纹管道位于所述容纳腔内,且所述波纹管道与所述容纳腔之间的间隙填充有下护管混凝土体;所述限位架与所述侧板固定设置,所述限位架位于所述波纹管道的上部,且波纹管道上部覆盖有以所述限位架为骨架的上护管混凝土体;本申请还涉及一种施工方法,包括S1测量放线、S2沟槽开挖、S3基础碎石垫层施工、S4基座安装、S5波纹管道安装、S6限位架安装、S7浇筑下护管混凝土、S8浇筑上护管混凝土、S9沟槽回填;本申请能够提高波纹管道的结构强度和承载能力。
Drainage pipeline structure and construction method thereof
一种排水管道结构及其施工方法
CHEN XIYANG (Autor:in) / SHAO MIAOZHEN (Autor:in) / SU YONGYUAN (Autor:in)
20.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
Drainage pipeline structure and construction method thereof
Europäisches Patentamt | 2022
|Municipal drainage pipeline structure and construction method thereof
Europäisches Patentamt | 2023
|Drainage pipeline connector structure and pipeline construction method
Europäisches Patentamt | 2023
|Municipal drainage pipeline and construction method thereof
Europäisches Patentamt | 2021
|