Floor installation method for water and floor heating position
The invention belongs to the field of building construction, and particularly relates to a floor installation method for a water and floor heating position. The floor installation method for the waterand floor heating position comprises the following steps of fixed rod positioning installation, extruded plate installation, reflective film laying, floor heating water pipe installation and fixing,floor heating water pipe pressure test pressure maintaining, steel mesh laying, keel installation leveling, concrete casting and compacting and floor laying. According to the floor installation methodfor the water and floor heating position, a fixed rod and a keel are first installed on the structural ground, it is guaranteed that a bottom plate is flat and has no undulation, the keel is prevented from being broken, a floor heating pipe is prevented from being broken, the level of the keel is easily adjusted by a nut under the fixed rod, a level ruler is used for testing, the installation quality of the floor is finally ensured, a concrete surface layer is close to the floor, the heat transfer effect is better, the construction is standardized and scientific, less time is consumed, the quality is stable, workers can conveniently grasp the floor installation method, and promotion is high.
本发明属于建筑施工领域,尤其涉及一种水地暖位置上的地板安装方法,步骤依次如下:固定杆定位安装‑挤塑板安装‑反射膜敷设‑地暖水管安装固定‑地暖水管试压保压‑钢丝网片铺设‑龙骨安装校平‑混凝土浇捣‑地板铺设。本发明先在结构地面上安装固定杆和龙骨,不仅保证底板平整无起伏,而且可以防止龙骨打破或者打断地暖水管,同时龙骨的水平很容易通过固定杆下方的螺母进行高度调整,水平尺来进行测试,最终确保了地板的安装质量,而且混凝土面层与地板紧贴,传热效果更好,并且施工规范,科学,用时少,质量稳定,工人掌握方便,推广性强。
Floor installation method for water and floor heating position
The invention belongs to the field of building construction, and particularly relates to a floor installation method for a water and floor heating position. The floor installation method for the waterand floor heating position comprises the following steps of fixed rod positioning installation, extruded plate installation, reflective film laying, floor heating water pipe installation and fixing,floor heating water pipe pressure test pressure maintaining, steel mesh laying, keel installation leveling, concrete casting and compacting and floor laying. According to the floor installation methodfor the water and floor heating position, a fixed rod and a keel are first installed on the structural ground, it is guaranteed that a bottom plate is flat and has no undulation, the keel is prevented from being broken, a floor heating pipe is prevented from being broken, the level of the keel is easily adjusted by a nut under the fixed rod, a level ruler is used for testing, the installation quality of the floor is finally ensured, a concrete surface layer is close to the floor, the heat transfer effect is better, the construction is standardized and scientific, less time is consumed, the quality is stable, workers can conveniently grasp the floor installation method, and promotion is high.
本发明属于建筑施工领域,尤其涉及一种水地暖位置上的地板安装方法,步骤依次如下:固定杆定位安装‑挤塑板安装‑反射膜敷设‑地暖水管安装固定‑地暖水管试压保压‑钢丝网片铺设‑龙骨安装校平‑混凝土浇捣‑地板铺设。本发明先在结构地面上安装固定杆和龙骨,不仅保证底板平整无起伏,而且可以防止龙骨打破或者打断地暖水管,同时龙骨的水平很容易通过固定杆下方的螺母进行高度调整,水平尺来进行测试,最终确保了地板的安装质量,而且混凝土面层与地板紧贴,传热效果更好,并且施工规范,科学,用时少,质量稳定,工人掌握方便,推广性强。
Floor installation method for water and floor heating position
一种水地暖位置上的地板安装方法
ZHANG YUANQIANG (Autor:in) / YANG SHAOHONG (Autor:in) / WANG YAGE (Autor:in) / LIU CHENGTAO (Autor:in) / QI MINGLEI (Autor:in) / ZHENG MIAOMIAO (Autor:in) / WANG PENGFEI (Autor:in)
20.10.2020
Patent
Elektronische Ressource
Chinesisch
FLOOR INSTALLATION MECHANISM, FLOOR INSTALLATION DEVICE AND FLOOR INSTALLATION METHOD
Europäisches Patentamt | 2022
|