Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to a mining area collapse backfill area ecological management and repairing method. The mining area collapse backfill area ecological management and repairing method adopts a backfill area ecological management and repairing device. The backfill area ecological management and repairing device comprises a locking plate, a front side plate, a back side plate, a repairing rolling wheel, a rotating motor, a rotary shaft, a fixed sleeve and a filling mechanism. The mining area collapse backfill area ecological repairing method using the backfill area ecological management andrepairing device comprises the following steps of: S1: collapse ground substrate treatment; S2: collapse ground paving; S3: ground surface layer rolling; S4: ground surface layer filling; and S5: ground surface layer overall rolling. The method can solve the following problems existing in gangue or concrete pavement of a ground surface layer: the block sizes of gangue or stones are different, so concave can be easily formed in the ground surface layer and the ground surface layer is not flat; and therefore initial rolling of the ground surface layer cannot be conducted during following groundrolling and during gangue or stone pavement.
本发明涉及一种矿区塌陷回填区生态治理修复方法,该塌陷回填区生态治理修复方法采用如下回填区生态治理修复装置,该回填区生态治理修复装置包括锁定板、前侧板、后侧板、修复滚轮、转动电机、转轴、固定套和填充机构;采用上述回填区生态治理修复装置对矿区塌陷回填区生态的修复方法,包括以下步骤:S1、塌陷地面基层处理;S2、塌陷地面摊铺;S3、地面表层滚压;S4、地面表层填实;S5、地面表层整体滚压。本发明可以解决现有针对地面表层的矸石或者混凝土进行摊铺时存在的:矸石或者石子的块径不一,从而地面的表层容易出现凹陷,使得地面表层不平整,导致后期地面的滚压效果、矸石或者石子进行摊平时无法对其进行初步滚压等问题。
The invention relates to a mining area collapse backfill area ecological management and repairing method. The mining area collapse backfill area ecological management and repairing method adopts a backfill area ecological management and repairing device. The backfill area ecological management and repairing device comprises a locking plate, a front side plate, a back side plate, a repairing rolling wheel, a rotating motor, a rotary shaft, a fixed sleeve and a filling mechanism. The mining area collapse backfill area ecological repairing method using the backfill area ecological management andrepairing device comprises the following steps of: S1: collapse ground substrate treatment; S2: collapse ground paving; S3: ground surface layer rolling; S4: ground surface layer filling; and S5: ground surface layer overall rolling. The method can solve the following problems existing in gangue or concrete pavement of a ground surface layer: the block sizes of gangue or stones are different, so concave can be easily formed in the ground surface layer and the ground surface layer is not flat; and therefore initial rolling of the ground surface layer cannot be conducted during following groundrolling and during gangue or stone pavement.
本发明涉及一种矿区塌陷回填区生态治理修复方法,该塌陷回填区生态治理修复方法采用如下回填区生态治理修复装置,该回填区生态治理修复装置包括锁定板、前侧板、后侧板、修复滚轮、转动电机、转轴、固定套和填充机构;采用上述回填区生态治理修复装置对矿区塌陷回填区生态的修复方法,包括以下步骤:S1、塌陷地面基层处理;S2、塌陷地面摊铺;S3、地面表层滚压;S4、地面表层填实;S5、地面表层整体滚压。本发明可以解决现有针对地面表层的矸石或者混凝土进行摊铺时存在的:矸石或者石子的块径不一,从而地面的表层容易出现凹陷,使得地面表层不平整,导致后期地面的滚压效果、矸石或者石子进行摊平时无法对其进行初步滚压等问题。
Mining area collapse backfill area ecological management and repairing method
一种矿区塌陷回填区生态治理修复方法
PENG TING (Autor:in)
23.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E21F
Sicherheitsvorrichtungen, Förderung, Auffüllen oder Bergversatz, Rettungswesen, Bewetterung oder Entwässerung in oder von Gruben oder Tunnels
,
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
/
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Europäisches Patentamt | 2022
|Reinforcing method for ecological restoration backfill area of ore extraction area
Europäisches Patentamt | 2023
|Mining area slope ecological self-repairing promoting method and device
Europäisches Patentamt | 2023
|Ore mining ecological restoration backfill reinforcement method
Europäisches Patentamt | 2024
|