Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Highway bridge prestress cable penetrating system convenient to maintain
The highway bridge prestress cable penetrating system convenient to maintain comprises a shell, groove plates, a bottom plate and a mounting base, wherein the groove plates are fixedly connected to the left side and the right side of the shell, the bottom plate is fixedly connected to the bottom end of the shell, the mounting base is fixedly connected to the upper surface of the bottom plate, anda power mechanism is mounted in the mounting base. The invention discloses a highway bridge prestress cable penetrating system. A motor, a coupler, a rotating rod, a first bearing, a first friction wheel, a supporting rod and the like are matched for use; when the first friction wheel is abraded, the first friction wheel can be replaced by disassembling and assembling the mounting shaft, operationis easy, maintenance is convenient, the ejector rod is arranged to extrude the driving plate frame so as to apply pressure to the first friction wheel, and when the first friction wheel is abraded, the friction force of the first friction wheel to the second friction wheel is ensured to be stable, and slipping is prevented.
本发明公开了一种便于维护的公路桥梁预应力穿索系统,包括壳体、槽板、底板和安装座,所述壳体的左右两侧均固接有槽板,所述壳体的底端固接有底板,所述底板的上表面固接有安装座,所述安装座的内部安装有动力机构。该公路桥梁预应力穿索系统,通过电机、联轴器、转杆、第一轴承、第一摩擦轮和支撑杆等的配合使用,在当第一摩擦轮出现磨损时,通过拆装安装轴就能完成对第一摩擦轮的更换,操作简单,便于维护,通过设置顶杆来挤压驱动板架,以此对第一摩擦轮施加压力作用,在第一摩擦轮出现磨损时,也能够保证第一摩擦轮对第二摩擦轮的摩擦力稳定,防止打滑。
Highway bridge prestress cable penetrating system convenient to maintain
The highway bridge prestress cable penetrating system convenient to maintain comprises a shell, groove plates, a bottom plate and a mounting base, wherein the groove plates are fixedly connected to the left side and the right side of the shell, the bottom plate is fixedly connected to the bottom end of the shell, the mounting base is fixedly connected to the upper surface of the bottom plate, anda power mechanism is mounted in the mounting base. The invention discloses a highway bridge prestress cable penetrating system. A motor, a coupler, a rotating rod, a first bearing, a first friction wheel, a supporting rod and the like are matched for use; when the first friction wheel is abraded, the first friction wheel can be replaced by disassembling and assembling the mounting shaft, operationis easy, maintenance is convenient, the ejector rod is arranged to extrude the driving plate frame so as to apply pressure to the first friction wheel, and when the first friction wheel is abraded, the friction force of the first friction wheel to the second friction wheel is ensured to be stable, and slipping is prevented.
本发明公开了一种便于维护的公路桥梁预应力穿索系统,包括壳体、槽板、底板和安装座,所述壳体的左右两侧均固接有槽板,所述壳体的底端固接有底板,所述底板的上表面固接有安装座,所述安装座的内部安装有动力机构。该公路桥梁预应力穿索系统,通过电机、联轴器、转杆、第一轴承、第一摩擦轮和支撑杆等的配合使用,在当第一摩擦轮出现磨损时,通过拆装安装轴就能完成对第一摩擦轮的更换,操作简单,便于维护,通过设置顶杆来挤压驱动板架,以此对第一摩擦轮施加压力作用,在第一摩擦轮出现磨损时,也能够保证第一摩擦轮对第二摩擦轮的摩擦力稳定,防止打滑。
Highway bridge prestress cable penetrating system convenient to maintain
一种便于维护的公路桥梁预应力穿索系统
SHAO XINGJIE (Autor:in)
27.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E04G
SCAFFOLDING
,
Baugerüste