Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Road maintenance structure and construction method thereof
The invention discloses a road maintenance structure and a construction method thereof. The road maintenance structure comprises a base, a pushing handle installed on the base, a joint cutting deviceinstalled on the base and located at one end, away from the pushing handle, of the base, a compacting device installed on the base and located at the end, close to the pushing handle, of the base, anda mixing device installed on the base and located between the joint cutting device and the compacting device. The joint cutting device comprises a fixing base, a cutting assembly movably installed onthe fixing base and used for cutting an edge of a crack, and a first electric push rod installed on the base and used for pushing the cutting assembly to move. The mixing device comprises a shell, anauxiliary assembly installed on the shell and used for scraping the inner wall of the shell, and a stirring assembly installed in the shell and used for stirring asphalt. The structure and the methodcan be used to overcome the defects of the prior art, a special device and method for road maintenance are provided, and the structure solves problems of a poor mixing effect of asphalt, a stabilizerand a modifier, and untight asphalt repair and crack edge in an existing device.
本发明公开了一种道路维护结构及其施工方法。所述道路维护结构包括底座,安装在底座的推手,安装在底座上且位于底座远离推手一端的切缝装置,安装在底座上且位于底座靠近推手一端的压实装置,安装在底座上且位于切缝装置与压实装置之间的混合装置。切缝装置包括固定座,移动地安装在固定座上且用于切割裂缝边缘的切割组件,安装在底座上且用于推动切割组件移动的第一电动推杆;混合装置包括壳体,安装在壳体上且用于壳体内壁刮料的辅助组件,安装在壳体内上且用于搅拌沥青的搅拌组件。本发明克服现有技术的不足,提供了一种专门用于道路维护的装置与方法,该结构解决了现有装置沥青与稳定剂、改性剂混合效果差,沥青修补与裂缝边缘不紧密的问题。
Road maintenance structure and construction method thereof
The invention discloses a road maintenance structure and a construction method thereof. The road maintenance structure comprises a base, a pushing handle installed on the base, a joint cutting deviceinstalled on the base and located at one end, away from the pushing handle, of the base, a compacting device installed on the base and located at the end, close to the pushing handle, of the base, anda mixing device installed on the base and located between the joint cutting device and the compacting device. The joint cutting device comprises a fixing base, a cutting assembly movably installed onthe fixing base and used for cutting an edge of a crack, and a first electric push rod installed on the base and used for pushing the cutting assembly to move. The mixing device comprises a shell, anauxiliary assembly installed on the shell and used for scraping the inner wall of the shell, and a stirring assembly installed in the shell and used for stirring asphalt. The structure and the methodcan be used to overcome the defects of the prior art, a special device and method for road maintenance are provided, and the structure solves problems of a poor mixing effect of asphalt, a stabilizerand a modifier, and untight asphalt repair and crack edge in an existing device.
本发明公开了一种道路维护结构及其施工方法。所述道路维护结构包括底座,安装在底座的推手,安装在底座上且位于底座远离推手一端的切缝装置,安装在底座上且位于底座靠近推手一端的压实装置,安装在底座上且位于切缝装置与压实装置之间的混合装置。切缝装置包括固定座,移动地安装在固定座上且用于切割裂缝边缘的切割组件,安装在底座上且用于推动切割组件移动的第一电动推杆;混合装置包括壳体,安装在壳体上且用于壳体内壁刮料的辅助组件,安装在壳体内上且用于搅拌沥青的搅拌组件。本发明克服现有技术的不足,提供了一种专门用于道路维护的装置与方法,该结构解决了现有装置沥青与稳定剂、改性剂混合效果差,沥青修补与裂缝边缘不紧密的问题。
Road maintenance structure and construction method thereof
一种道路维护结构及其施工方法
DU DONGSHENG (Autor:in)
30.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Intersection road maintenance construction method and road structure thereof
Europäisches Patentamt | 2023
|Road construction and maintenance of road construction
Engineering Index Backfile | 1876
|Road construction and maintenance
Engineering Index Backfile | 1914
|Road construction and maintenance
Engineering Index Backfile | 1912