Bagged gravel fence construction method
The invention discloses a bagged gravel fence construction method. The bagged sand fence construction method comprises the following steps of S1, preparing bagged gravel, i.e., filling a bag with a filler, wherein the filler comprises at least one of soil, sand and gravel; S2, transporting the bagged gravel to a place close to a collapsed position; S3, leveling the bottom of a collapsed gap, transporting the bagged gravel to the collapsed gap, hierarchically stacking the bagged gravel on the slope toe of a collapsed slope line from bottom to top in a staggered way, and gradually leveling the slope; S4, when the bagged gravel is refilled to the original road side, paving one layer of cemented gravel pavement to obtain a new pavement; and S5, arranging a row of anchoring piles on the side, close to the bottom of the slope toe of an original roadbed slope line, of the bagged gravel. The construction method is suitable for first-aid repairing of a collapsed road segment which is high and steep in the inner side and is not liable to refill, and has the advantages of easiness and rapidness in construction.
本发明公开了一种袋装砂石拦边施工方法,包括以下步骤:S1、制备袋装砂石:向盛物袋中装入填充物,所述填充物至少包括土、砂和碎石中的一种;S2、将袋装砂石运输至坍塌处附近;S3、整平坍塌缺口底部,将袋装砂石运输至坍塌缺口处,将袋装砂石在垮塌后边坡线的坡脚自下而上分层交错码砌,并逐渐收坡;S4、当袋装砂石回填至原有路面时,重新铺装一层泥结碎石路面获得新铺装路面;S5、袋装砂石靠近原路基边坡线坡脚一侧设置一排锚固桩。本发明所述施工方法适用于内侧高陡、外侧不易回填的道路坍塌路段的抢通,具有施工简单快速的优点。
Bagged gravel fence construction method
The invention discloses a bagged gravel fence construction method. The bagged sand fence construction method comprises the following steps of S1, preparing bagged gravel, i.e., filling a bag with a filler, wherein the filler comprises at least one of soil, sand and gravel; S2, transporting the bagged gravel to a place close to a collapsed position; S3, leveling the bottom of a collapsed gap, transporting the bagged gravel to the collapsed gap, hierarchically stacking the bagged gravel on the slope toe of a collapsed slope line from bottom to top in a staggered way, and gradually leveling the slope; S4, when the bagged gravel is refilled to the original road side, paving one layer of cemented gravel pavement to obtain a new pavement; and S5, arranging a row of anchoring piles on the side, close to the bottom of the slope toe of an original roadbed slope line, of the bagged gravel. The construction method is suitable for first-aid repairing of a collapsed road segment which is high and steep in the inner side and is not liable to refill, and has the advantages of easiness and rapidness in construction.
本发明公开了一种袋装砂石拦边施工方法,包括以下步骤:S1、制备袋装砂石:向盛物袋中装入填充物,所述填充物至少包括土、砂和碎石中的一种;S2、将袋装砂石运输至坍塌处附近;S3、整平坍塌缺口底部,将袋装砂石运输至坍塌缺口处,将袋装砂石在垮塌后边坡线的坡脚自下而上分层交错码砌,并逐渐收坡;S4、当袋装砂石回填至原有路面时,重新铺装一层泥结碎石路面获得新铺装路面;S5、袋装砂石靠近原路基边坡线坡脚一侧设置一排锚固桩。本发明所述施工方法适用于内侧高陡、外侧不易回填的道路坍塌路段的抢通,具有施工简单快速的优点。
Bagged gravel fence construction method
一种袋装砂石拦边施工方法
ZHANG SHENG (Autor:in) / YUAN SONG (Autor:in) / SHAO LIN (Autor:in) / WANG XIBAO (Autor:in) / ZHOU KE (Autor:in)
30.10.2020
Patent
Elektronische Ressource
Chinesisch