Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fast locking device for prefabricated building finishing construction
The invention discloses a fast locking device for prefabricated building finishing construction. The fast locking device comprises a first building wall board, a second building wall board, a third building wall board and a fourth building wall board, wherein the first building wall board is fixedly connected to the top of the second building wall board, the third building wall board and the fourth building wall board are fixedly connected to one side of the first building wall board and one side of the second building wall board respectively, and two locking assemblies are symmetrically arranged between the first building wall board and the second building wall board. Each locking assembly comprises a jacking rod and a fixing block, wherein a pressing plate is slidably installed in the fixing block, springs are fixedly connected to the inner walls of the pressing plate and the fixing block, and one end of the jacking rod is in threaded connection in the fixing block. The two adjacentfixing blocks are symmetrically and fixedly installed on one side of the bottom of the first building wall board, one side of the bottom of the second building wall board, one side of the bottom of the third building wall board and one side of the bottom of the fourth building wall board respectively, the building wall boards are quickly locked up, and disassembly and installation are facilitatedduring maintenance.
本发明公开了一种装配建筑装修施工用快速锁紧装置,包括第一建筑墙板、第二建筑墙板、第三建筑墙板和第四建筑墙板,所述第一建筑墙板固定连接于第二建筑墙板顶部,所述第三建筑墙板和第四建筑墙板分别固定连接于第一建筑墙板和第二建筑墙板一侧,所述第一建筑墙板、第二建筑墙板之间对称设置有两组锁紧组件,所述锁紧组件包括顶杆和固定块,所述固定块内滑动安装有压紧板,所述压紧板和固定块内壁固定连接有弹簧,所述顶杆一端螺纹连接于固定块内,相邻两组所述固定块分别对称且固定安装于第一建筑墙板、第二建筑墙板、第三建筑墙板和第四建筑墙板底部一侧,快速对建筑墙板进行锁紧,便于维修时的拆卸和安装。
Fast locking device for prefabricated building finishing construction
The invention discloses a fast locking device for prefabricated building finishing construction. The fast locking device comprises a first building wall board, a second building wall board, a third building wall board and a fourth building wall board, wherein the first building wall board is fixedly connected to the top of the second building wall board, the third building wall board and the fourth building wall board are fixedly connected to one side of the first building wall board and one side of the second building wall board respectively, and two locking assemblies are symmetrically arranged between the first building wall board and the second building wall board. Each locking assembly comprises a jacking rod and a fixing block, wherein a pressing plate is slidably installed in the fixing block, springs are fixedly connected to the inner walls of the pressing plate and the fixing block, and one end of the jacking rod is in threaded connection in the fixing block. The two adjacentfixing blocks are symmetrically and fixedly installed on one side of the bottom of the first building wall board, one side of the bottom of the second building wall board, one side of the bottom of the third building wall board and one side of the bottom of the fourth building wall board respectively, the building wall boards are quickly locked up, and disassembly and installation are facilitatedduring maintenance.
本发明公开了一种装配建筑装修施工用快速锁紧装置,包括第一建筑墙板、第二建筑墙板、第三建筑墙板和第四建筑墙板,所述第一建筑墙板固定连接于第二建筑墙板顶部,所述第三建筑墙板和第四建筑墙板分别固定连接于第一建筑墙板和第二建筑墙板一侧,所述第一建筑墙板、第二建筑墙板之间对称设置有两组锁紧组件,所述锁紧组件包括顶杆和固定块,所述固定块内滑动安装有压紧板,所述压紧板和固定块内壁固定连接有弹簧,所述顶杆一端螺纹连接于固定块内,相邻两组所述固定块分别对称且固定安装于第一建筑墙板、第二建筑墙板、第三建筑墙板和第四建筑墙板底部一侧,快速对建筑墙板进行锁紧,便于维修时的拆卸和安装。
Fast locking device for prefabricated building finishing construction
一种装配建筑装修施工用快速锁紧装置
MAO HUIQUAN (Autor:in)
30.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
CONSTRUCTION METHOD OF PREFABRICATED BUILDING AND PREFABRICATED BUILDING
Europäisches Patentamt | 2019
|