Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rapid windowsill coping construction structure and construction method
The invention relates to a rapid windowsill coping construction structure and a construction method. The rapid windowsill coping construction structure comprises a plurality of shell membranes, and aspacing assembly used for mutual positioning of the shell membranes is arranged between every two adjacent shell membranes. Each shell membrane is provided with a positioning assembly used for limiting building blocks on the upper part of a windowsill coping, and the length directions of the shell membranes are arranged in the length direction of the coping. Every two adjacent shell membranes fixed to the top of a lower wall body to form a pouring formwork of the windowsill coping, containing grooves are formed in the top faces of the shell membranes in the length directions of the shell membranes, the two ends of each containing groove communicate with the outside, and containing grooves of every two adjacent shell membranes communicate with each other to form a space for containing a reinforcement cage used for coping pouring. According to the structure and the method, the upper wall building blocks are directly built without the need to wait for the windowsill coping pouring procedure, labor input during construction is small, the construction procedure is simplified, and the construction period is shortened.
本申请涉及一种快速施工窗台压顶结构及施工方法,其包括壳膜,壳膜设置有多个,相邻壳膜之间设置有用于壳膜相互定位的定距组件,每个壳膜上均设置有用于与窗台压顶上部砌块限位的定位组件,壳膜长度方向沿压顶长度方向设置,相邻壳膜固定在下部墙体顶部组成窗台压顶的浇筑模板,壳膜顶面开设有容纳槽,容纳槽沿壳膜长度方向开设且两端与外界开通,相邻容纳槽连通的空间用于盛放压顶浇筑用钢筋笼。本申请具有无需等待窗台压顶浇筑工序,直接砌筑上部墙体砌块,达到施工时投入人力少,简化了施工工序,节省施工工期的效果。
Rapid windowsill coping construction structure and construction method
The invention relates to a rapid windowsill coping construction structure and a construction method. The rapid windowsill coping construction structure comprises a plurality of shell membranes, and aspacing assembly used for mutual positioning of the shell membranes is arranged between every two adjacent shell membranes. Each shell membrane is provided with a positioning assembly used for limiting building blocks on the upper part of a windowsill coping, and the length directions of the shell membranes are arranged in the length direction of the coping. Every two adjacent shell membranes fixed to the top of a lower wall body to form a pouring formwork of the windowsill coping, containing grooves are formed in the top faces of the shell membranes in the length directions of the shell membranes, the two ends of each containing groove communicate with the outside, and containing grooves of every two adjacent shell membranes communicate with each other to form a space for containing a reinforcement cage used for coping pouring. According to the structure and the method, the upper wall building blocks are directly built without the need to wait for the windowsill coping pouring procedure, labor input during construction is small, the construction procedure is simplified, and the construction period is shortened.
本申请涉及一种快速施工窗台压顶结构及施工方法,其包括壳膜,壳膜设置有多个,相邻壳膜之间设置有用于壳膜相互定位的定距组件,每个壳膜上均设置有用于与窗台压顶上部砌块限位的定位组件,壳膜长度方向沿压顶长度方向设置,相邻壳膜固定在下部墙体顶部组成窗台压顶的浇筑模板,壳膜顶面开设有容纳槽,容纳槽沿壳膜长度方向开设且两端与外界开通,相邻容纳槽连通的空间用于盛放压顶浇筑用钢筋笼。本申请具有无需等待窗台压顶浇筑工序,直接砌筑上部墙体砌块,达到施工时投入人力少,简化了施工工序,节省施工工期的效果。
Rapid windowsill coping construction structure and construction method
一种快速施工窗台压顶结构及施工方法
WANG SHAOJIE (Autor:in) / LI KAI (Autor:in) / ZHANG PENGCHENG (Autor:in)
30.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Prefabricated windowsill coping structure and construction method
Europäisches Patentamt | 2024
|Three-section post-pouring windowsill coping construction structure
Europäisches Patentamt | 2024
|Waterproof windowsill coping and construction method thereof
Europäisches Patentamt | 2023
|Windowsill heat preservation structure and construction method
Europäisches Patentamt | 2023
|