Cast-in-place wall reserved hole control structure and construction method thereof
The invention relates to a cast-in-place wall reserved hole control structure and a construction method thereof, and belongs to the technical field of cast-in-place concrete construction. The cast-in-place wall reserved hole control structure comprises opposite aluminum alloy forms located on the two sides of a cast-in-place wall and a reserved pipe located between the two opposite aluminum alloyforms and perpendicular to the aluminum alloy forms; the two axial ends of the reserved pipe abut against the aluminum alloy forms respectively; positioning assemblies for limiting displacement of thereserved pipe are arranged at the two axial ends of the reserved pipe, and the positioning assemblies are detachably connected with the aluminum alloy forms. The construction method comprises the steps of reserved hole position determination, positioning plate installation, reserved pipe installation and reserved pipe fixation. The cast-in-place wall reserved hole control structure and the construction method thereof have the effect of avoiding displacement of the reserved pipe during concrete pouring, the position accuracy of the reserved hole is guaranteed, and re-holing in the wall in thelater period is avoided.
本发明涉及一种现浇墙体预留洞控制结构及其施工方法,属于现浇混凝土施工的技术领域,包括位于现浇墙体两侧相对的铝合金模板以及位于两相对的铝合金模板之间并垂直于铝合金模板的预留管,预留管轴向的两端分别与铝合金模板抵接;预留管轴向两端设置有限制预留管移位的定位组件,定位组件与铝合金模板可拆卸连接;本发明的施工方法的步骤包括预留洞位置确定→定位板安装→预留管安装→预留管固定。本发明具有避免预留管在浇筑混凝土时发生移位的效果,保证了预留洞位置准确,避免后期在墙体上重新开洞。
Cast-in-place wall reserved hole control structure and construction method thereof
The invention relates to a cast-in-place wall reserved hole control structure and a construction method thereof, and belongs to the technical field of cast-in-place concrete construction. The cast-in-place wall reserved hole control structure comprises opposite aluminum alloy forms located on the two sides of a cast-in-place wall and a reserved pipe located between the two opposite aluminum alloyforms and perpendicular to the aluminum alloy forms; the two axial ends of the reserved pipe abut against the aluminum alloy forms respectively; positioning assemblies for limiting displacement of thereserved pipe are arranged at the two axial ends of the reserved pipe, and the positioning assemblies are detachably connected with the aluminum alloy forms. The construction method comprises the steps of reserved hole position determination, positioning plate installation, reserved pipe installation and reserved pipe fixation. The cast-in-place wall reserved hole control structure and the construction method thereof have the effect of avoiding displacement of the reserved pipe during concrete pouring, the position accuracy of the reserved hole is guaranteed, and re-holing in the wall in thelater period is avoided.
本发明涉及一种现浇墙体预留洞控制结构及其施工方法,属于现浇混凝土施工的技术领域,包括位于现浇墙体两侧相对的铝合金模板以及位于两相对的铝合金模板之间并垂直于铝合金模板的预留管,预留管轴向的两端分别与铝合金模板抵接;预留管轴向两端设置有限制预留管移位的定位组件,定位组件与铝合金模板可拆卸连接;本发明的施工方法的步骤包括预留洞位置确定→定位板安装→预留管安装→预留管固定。本发明具有避免预留管在浇筑混凝土时发生移位的效果,保证了预留洞位置准确,避免后期在墙体上重新开洞。
Cast-in-place wall reserved hole control structure and construction method thereof
一种现浇墙体预留洞控制结构及其施工方法
GUO HAILONG (Autor:in) / YANG SHOUSHAN (Autor:in) / SONG SHUANGQIANG (Autor:in) / JIA DONGSHENG (Autor:in) / LIU HONG (Autor:in)
30.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2023
|Construction method of reserved hole in cast-in-place floor plate
Europäisches Patentamt | 2023
|Cast-in-place floor reserved hole pre-embedding device and construction method
Europäisches Patentamt | 2021
|