Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Garden road construction device and construction method thereof
The invention relates to a garden road construction device and method. The garden road construction device comprises a trolley, and a raw material hopper is installed on the trolley; a plurality of discharging pipes are installed on the trolley side by side in the width direction of the road, one ends of the discharging pipes communicate with the bottom of the raw material hopper, the other ends of the discharging pipes face the road surface, and switching mechanisms used for intermittently opening the discharging pipes are arranged at the ends, away from the raw material hopper, of the discharging pipes; and a pressing plate capable of lifting in a reciprocating manner in the vertical direction is arranged below the trolley. When an operator paves a pebble road in a garden, an opening ofa discharging pipe of the trolley faces the advancing direction of the trolley, the trolley is driven to run along the road, the pebbles sequentially fall onto the road from the discharging pipe in rows by intermittently opening the opening of the discharging pipe, and the pebbles are pressed into mortar on the road to be fixed through a pressing plate. The method has the effects of improving theconstruction efficiency and shortening the construction period.
本申请涉及一种园林道路施工装置及其施工方法,其包括小车,小车上安装有原料斗;小车上沿道路宽度方向并排安装有若干根出料管,出料管的一端与原料斗的底部连通、另一端朝向路面,出料管远离原料斗的一端设置有用于间歇开启出料管的开关机构;小车的下方设置有按在竖直方向往复升降压板。操作人员在铺设园林中卵石路时,将小车的出料管的开口朝向小车的前进方向,驱使小车沿道路行驶,并通过使出料管的开口间歇开启,使鹅卵石呈排依次从出料管落出在道路上,并通过按压板将卵石压入道路上的砂浆中固定,本申请具有提高施工效率,缩短施工工期的效果。
Garden road construction device and construction method thereof
The invention relates to a garden road construction device and method. The garden road construction device comprises a trolley, and a raw material hopper is installed on the trolley; a plurality of discharging pipes are installed on the trolley side by side in the width direction of the road, one ends of the discharging pipes communicate with the bottom of the raw material hopper, the other ends of the discharging pipes face the road surface, and switching mechanisms used for intermittently opening the discharging pipes are arranged at the ends, away from the raw material hopper, of the discharging pipes; and a pressing plate capable of lifting in a reciprocating manner in the vertical direction is arranged below the trolley. When an operator paves a pebble road in a garden, an opening ofa discharging pipe of the trolley faces the advancing direction of the trolley, the trolley is driven to run along the road, the pebbles sequentially fall onto the road from the discharging pipe in rows by intermittently opening the opening of the discharging pipe, and the pebbles are pressed into mortar on the road to be fixed through a pressing plate. The method has the effects of improving theconstruction efficiency and shortening the construction period.
本申请涉及一种园林道路施工装置及其施工方法,其包括小车,小车上安装有原料斗;小车上沿道路宽度方向并排安装有若干根出料管,出料管的一端与原料斗的底部连通、另一端朝向路面,出料管远离原料斗的一端设置有用于间歇开启出料管的开关机构;小车的下方设置有按在竖直方向往复升降压板。操作人员在铺设园林中卵石路时,将小车的出料管的开口朝向小车的前进方向,驱使小车沿道路行驶,并通过使出料管的开口间歇开启,使鹅卵石呈排依次从出料管落出在道路上,并通过按压板将卵石压入道路上的砂浆中固定,本申请具有提高施工效率,缩短施工工期的效果。
Garden road construction device and construction method thereof
一种园林道路施工装置及其施工方法
ZHANG HONGYUN (Autor:in)
03.11.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Ecological garden road and rapid construction device and construction method thereof
Europäisches Patentamt | 2023
|