Section steel beam and aerated concrete block combined partition wall
The invention discloses a section steel beam and aerated concrete block combined partition wall which comprises three sets of vertical beams and at least thirty sets of aerated concrete block assemblies, the aerated concrete block assemblies are arrayed between every two adjacent sets of vertical beams at equal intervals, and each aerated concrete block assembly comprises a first building block and a second building block. The first building blocks and the second building blocks are clamped and fixed, third building blocks are arranged in the middles of the bottoms of the first building blocksand the second building blocks, the third building blocks are clamped and fixed to the first building blocks and the second building blocks respectively, locking assemblies are arranged at the positions, located at the installation positions of the first building blocks, in the vertical beams, and each locking assembly comprises a positioning block and a locking bolt. The positioning blocks are rotationally installed at one ends of the locking bolts, the ends, rotationally connected with the positioning blocks, of the locking bolts penetrate through the vertical beams and extend to the outsides of the vertical beams, the positioning blocks are in sliding connection with the vertical beams, the partition wall is formed in a manner that section steel beams and autoclaved aerated concrete blocks are combined, and the overall increased load is low.
本发明公开了一种型钢梁与加气混凝土砌块组合隔墙,包括三组立梁和至少三十组加气混凝土砌块组件,所述加气混凝土砌块组件等距阵列于相邻两组立梁之间,所述加气混凝土砌块组件包括第一砌块和第二砌块,所述第一砌块和第二砌块卡接固定,且第一砌块和第二砌块底部居中位置设置有第三砌块,所述第三砌块分别与第一砌块和第二砌块卡接固定,所述立梁内位于第一砌块安装位置均设置有锁紧组件,所述锁紧组件包括定位块和锁紧螺栓,所述定位块转动安装于锁紧螺栓一端,所述锁紧螺栓转动连接定位块一端贯穿于立梁且延伸至立梁外部,所述定位块与立梁滑动连接,利用型钢梁与蒸压加气混凝土砌块组合的形式构成隔墙,整体增加的荷载轻。
Section steel beam and aerated concrete block combined partition wall
The invention discloses a section steel beam and aerated concrete block combined partition wall which comprises three sets of vertical beams and at least thirty sets of aerated concrete block assemblies, the aerated concrete block assemblies are arrayed between every two adjacent sets of vertical beams at equal intervals, and each aerated concrete block assembly comprises a first building block and a second building block. The first building blocks and the second building blocks are clamped and fixed, third building blocks are arranged in the middles of the bottoms of the first building blocksand the second building blocks, the third building blocks are clamped and fixed to the first building blocks and the second building blocks respectively, locking assemblies are arranged at the positions, located at the installation positions of the first building blocks, in the vertical beams, and each locking assembly comprises a positioning block and a locking bolt. The positioning blocks are rotationally installed at one ends of the locking bolts, the ends, rotationally connected with the positioning blocks, of the locking bolts penetrate through the vertical beams and extend to the outsides of the vertical beams, the positioning blocks are in sliding connection with the vertical beams, the partition wall is formed in a manner that section steel beams and autoclaved aerated concrete blocks are combined, and the overall increased load is low.
本发明公开了一种型钢梁与加气混凝土砌块组合隔墙,包括三组立梁和至少三十组加气混凝土砌块组件,所述加气混凝土砌块组件等距阵列于相邻两组立梁之间,所述加气混凝土砌块组件包括第一砌块和第二砌块,所述第一砌块和第二砌块卡接固定,且第一砌块和第二砌块底部居中位置设置有第三砌块,所述第三砌块分别与第一砌块和第二砌块卡接固定,所述立梁内位于第一砌块安装位置均设置有锁紧组件,所述锁紧组件包括定位块和锁紧螺栓,所述定位块转动安装于锁紧螺栓一端,所述锁紧螺栓转动连接定位块一端贯穿于立梁且延伸至立梁外部,所述定位块与立梁滑动连接,利用型钢梁与蒸压加气混凝土砌块组合的形式构成隔墙,整体增加的荷载轻。
Section steel beam and aerated concrete block combined partition wall
一种型钢梁与加气混凝土砌块组合隔墙
YANG HONGZHOU (Autor:in)
03.11.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Aerated block concrete internal partition wall structure and construction method thereof
Europäisches Patentamt | 2023
|Construction method of ALC board and autoclaved aerated concrete block combined wall
Europäisches Patentamt | 2024
|Discussion on Crack of Aerated Concrete Block Wall
Trans Tech Publications | 2011
|Aerated concrete block and preparation method of aerated concrete block
Europäisches Patentamt | 2015
|