Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel arch bridge skewback pre-buried support, pre-buried structure and implementation method
The invention discloses a steel arch bridge skewback pre-buried support, a pre-buried structure and an implementation method thereof.The steel arch bridge skewback pre-buried support comprises a landing rack, the landing rack comprises a supporting piece, a cross beam, an oblique beam, a connecting rod and a limiting rod, the cross beam and the oblique beam are welded and fixed to the supporting piece, and the two end faces of the connecting rod are welded and fixed to the supporting piece; one end of the oblique beam is welded and fixed to the side portion of one end of the cross beam, one end face of the limiting rod is welded and fixed to the end, away from the cross beam, of the oblique beam, one side of the limiting rod is welded and fixed to the supporting piece, and one end of the limiting rod is welded and fixed to the side portion of the connecting rod. And an adjusting piece is welded and fixed to the side part of the limiting rod. According to the support, the situation thatthe floor stand is unstable after the steel arch foot component is installed can be effectively reduced, safety accidents caused by instability of the floor stand are effectively avoided, the adjusting position of the first pressure bearing plate can be limited, and the installation efficiency of the floor stand and the pressure bearing assembly can be effectively improved.
本申请公开了一种钢拱桥拱座预埋支架、预埋结构及实施方法,包括落地台架,所述落地台架包括支撑件、横梁、斜梁、连接杆和限位杆,所述横梁和所述斜梁均焊接固定在所述支撑件上,所述连接杆的两端面与所述支撑件焊接固定,所述斜梁的一端与所述横梁的一端侧部焊接固定,所述限位杆的一端面与所述斜梁远离横梁的一端焊接固定,所述限位杆的一侧与所述支撑件焊接固定,所述限位杆的一端焊接固定在所述连接杆的侧部,所述限位杆的侧部焊接固定有调节件。本方案可以有效降低落地台架在安装钢拱脚构件后失稳的情况发生,有效的避免因落地台架失稳发生的安全事故,可以对第一承压板的调节位置进行限制,可以有效的提高落地台架与承压组件的安装效率。
Steel arch bridge skewback pre-buried support, pre-buried structure and implementation method
The invention discloses a steel arch bridge skewback pre-buried support, a pre-buried structure and an implementation method thereof.The steel arch bridge skewback pre-buried support comprises a landing rack, the landing rack comprises a supporting piece, a cross beam, an oblique beam, a connecting rod and a limiting rod, the cross beam and the oblique beam are welded and fixed to the supporting piece, and the two end faces of the connecting rod are welded and fixed to the supporting piece; one end of the oblique beam is welded and fixed to the side portion of one end of the cross beam, one end face of the limiting rod is welded and fixed to the end, away from the cross beam, of the oblique beam, one side of the limiting rod is welded and fixed to the supporting piece, and one end of the limiting rod is welded and fixed to the side portion of the connecting rod. And an adjusting piece is welded and fixed to the side part of the limiting rod. According to the support, the situation thatthe floor stand is unstable after the steel arch foot component is installed can be effectively reduced, safety accidents caused by instability of the floor stand are effectively avoided, the adjusting position of the first pressure bearing plate can be limited, and the installation efficiency of the floor stand and the pressure bearing assembly can be effectively improved.
本申请公开了一种钢拱桥拱座预埋支架、预埋结构及实施方法,包括落地台架,所述落地台架包括支撑件、横梁、斜梁、连接杆和限位杆,所述横梁和所述斜梁均焊接固定在所述支撑件上,所述连接杆的两端面与所述支撑件焊接固定,所述斜梁的一端与所述横梁的一端侧部焊接固定,所述限位杆的一端面与所述斜梁远离横梁的一端焊接固定,所述限位杆的一侧与所述支撑件焊接固定,所述限位杆的一端焊接固定在所述连接杆的侧部,所述限位杆的侧部焊接固定有调节件。本方案可以有效降低落地台架在安装钢拱脚构件后失稳的情况发生,有效的避免因落地台架失稳发生的安全事故,可以对第一承压板的调节位置进行限制,可以有效的提高落地台架与承压组件的安装效率。
Steel arch bridge skewback pre-buried support, pre-buried structure and implementation method
一种钢拱桥拱座预埋支架、预埋结构及实施方法
TIAN LIANMIN (Autor:in) / ZHANG HE (Autor:in) / WANG ANWEN (Autor:in) / XUE FEI (Autor:in) / QU KAI (Autor:in) / LIU XINGGUO (Autor:in)
10.11.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Structure-Soil Interaction of Buried Corrugated Steel Arch Bridge
British Library Conference Proceedings | 2011
|Response of Buried Arch Bridge Structure to Seismic Impact
TIBKAT | 2023
|Distribution of Wheel Loads to Concrete Arch Buried Bridge
British Library Conference Proceedings | 1993
|Seismic Fragility Assessment for a Newly Developed Buried Arch Bridge
Springer Verlag | 2023
|