Grouting construction process for prefabricated parapet wall and L-shaped water stop sill platform
The invention discloses a grouting construction process for a prefabricated parapet wall and an L-shaped water stop sill platform, and belongs to the technical field of building construction. The construction process comprises the following steps of preparation before construction, shaped steel formwork machining, steel bar binding and embedded part mounting, prefabricated parapet wall pouring, prefabricated parapet wall maintenance, component transportation, setting out positioning, positioning steel bar mounting, guide wall formwork erecting and concrete pouring, L-shaped concrete water stopsill platform construction, water stop sill platform long angle steel fixing, prefabricated parapet wall hoisting, bin dividing and slurry setting, temporary support fixing, grouting connection and abutted seam sealing. On-site wet operation and labor force are reduced, stable connection and fixation between wall bodies are guaranteed, and energy conservation and environmental protection are achieved.
一种预制女儿墙与“L”型止水坎台灌浆施工工艺,属于建筑施工技术领域。它包括如下步骤:施工前准备,定型钢模板加工,钢筋绑扎及预埋件安装,预制女儿墙浇筑,预制女儿墙养护,构件运输,放线定位,定位钢筋安装,导墙模板支设及混凝土浇筑,L型混凝土止水坎台施工,止水坎台长角钢固定,吊装预制女儿墙,分仓座浆,临时支撑固定,灌浆连接及拼缝密封。减少现场湿作业以及劳动力的使用,保证墙体之间连接固定稳定,绿色节能环保。
Grouting construction process for prefabricated parapet wall and L-shaped water stop sill platform
The invention discloses a grouting construction process for a prefabricated parapet wall and an L-shaped water stop sill platform, and belongs to the technical field of building construction. The construction process comprises the following steps of preparation before construction, shaped steel formwork machining, steel bar binding and embedded part mounting, prefabricated parapet wall pouring, prefabricated parapet wall maintenance, component transportation, setting out positioning, positioning steel bar mounting, guide wall formwork erecting and concrete pouring, L-shaped concrete water stopsill platform construction, water stop sill platform long angle steel fixing, prefabricated parapet wall hoisting, bin dividing and slurry setting, temporary support fixing, grouting connection and abutted seam sealing. On-site wet operation and labor force are reduced, stable connection and fixation between wall bodies are guaranteed, and energy conservation and environmental protection are achieved.
一种预制女儿墙与“L”型止水坎台灌浆施工工艺,属于建筑施工技术领域。它包括如下步骤:施工前准备,定型钢模板加工,钢筋绑扎及预埋件安装,预制女儿墙浇筑,预制女儿墙养护,构件运输,放线定位,定位钢筋安装,导墙模板支设及混凝土浇筑,L型混凝土止水坎台施工,止水坎台长角钢固定,吊装预制女儿墙,分仓座浆,临时支撑固定,灌浆连接及拼缝密封。减少现场湿作业以及劳动力的使用,保证墙体之间连接固定稳定,绿色节能环保。
Grouting construction process for prefabricated parapet wall and L-shaped water stop sill platform
一种预制女儿墙与“L”型止水坎台灌浆施工工艺
ZHU FEIFEI (Autor:in) / GAO YAN (Autor:in) / GONG LEI (Autor:in) / BAO YONGJIN (Autor:in) / LIU KANG (Autor:in)
10.11.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Roof parapet wall prefabricated flashing construction method
Europäisches Patentamt | 2024
|Installation method of L-shaped decoration integrated prefabricated parapet wall
Europäisches Patentamt | 2022
|Prefabricated module building parapet wall structure and construction method thereof
Europäisches Patentamt | 2021
|Cantilever type prefabricated parapet wall connecting structure
Europäisches Patentamt | 2022
|Parapet wall structure and parapet wall construction method
Europäisches Patentamt | 2021
|