Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to a building decoration sealant filling construction method. A fixing device, a telescopic support rod, a workbench, moving devices and a gluing device are included, wherein thefixing device is placed on the ground; the telescopic support rod is mounted at the upper end of the fixing device; the workbench is fixedly mounted at the tail end of the upper side of the telescopic support rod; the moving devices are symmetrically arranged on the front side and the rear side of the workbench; and the gluing device is mounted in the middle of the upper end of the workbench. According to the building decoration sealant filling construction method, through cooperation of the fixing device, the telescopic support rod, the workbench, the moving devices and the gluing device, the filling height can be adjusted at will in the sealant filling process, meanwhile, the distance between gaps of building decoration materials can be adjusted at will, and therefore the work efficiency is greatly improved.
本发明涉及一种建筑装修装饰密封胶填充施工方法,包括固定装置、伸缩支架杆、工作台、移动装置和涂胶装置,所述固定装置放置在地面上,固定装置上端安装有伸缩支架杆,伸缩支架杆上侧末端固定安装有工作台,工作台前后两侧对称设置有移动装置,工作台上端中部安装有涂胶装置,本发明设置的一种建筑装修装饰密封胶填充施工方法,通过固定装置,伸缩支架杆,工作台,移动装置和涂胶装置之间的配合,使在填充密封胶的过程中能过随意调节要填充的高度,同时又能随意调节建筑装修装饰材料缝隙与缝隙之间的距离,从而大大提高了工作时的效率。
The invention relates to a building decoration sealant filling construction method. A fixing device, a telescopic support rod, a workbench, moving devices and a gluing device are included, wherein thefixing device is placed on the ground; the telescopic support rod is mounted at the upper end of the fixing device; the workbench is fixedly mounted at the tail end of the upper side of the telescopic support rod; the moving devices are symmetrically arranged on the front side and the rear side of the workbench; and the gluing device is mounted in the middle of the upper end of the workbench. According to the building decoration sealant filling construction method, through cooperation of the fixing device, the telescopic support rod, the workbench, the moving devices and the gluing device, the filling height can be adjusted at will in the sealant filling process, meanwhile, the distance between gaps of building decoration materials can be adjusted at will, and therefore the work efficiency is greatly improved.
本发明涉及一种建筑装修装饰密封胶填充施工方法,包括固定装置、伸缩支架杆、工作台、移动装置和涂胶装置,所述固定装置放置在地面上,固定装置上端安装有伸缩支架杆,伸缩支架杆上侧末端固定安装有工作台,工作台前后两侧对称设置有移动装置,工作台上端中部安装有涂胶装置,本发明设置的一种建筑装修装饰密封胶填充施工方法,通过固定装置,伸缩支架杆,工作台,移动装置和涂胶装置之间的配合,使在填充密封胶的过程中能过随意调节要填充的高度,同时又能随意调节建筑装修装饰材料缝隙与缝隙之间的距离,从而大大提高了工作时的效率。
Building decoration sealant filling construction method
一种建筑装修装饰密封胶填充施工方法
17.11.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Building decoration sealant filling machine and filling method
Europäisches Patentamt | 2024
|Sealant injecting device for construction decoration surface
Europäisches Patentamt | 2021
|