The invention relates to the field of building construction, in particular to a fabricated building reinforcing component and a construction method thereof. The method comprises the following steps that S1, a main beam upper mounting frame and a main beam lower mounting frame are fixed to a main beam, and the main beam upper mounting frame and the main beam lower mounting frame are connected and fixed, and therefore, the main beam upper mounting frame and the main beam lower mounting frame are fixedly connected with the main beam; S2, a secondary beam mounting frame is fixed to a secondary beam, and meanwhile two telescopic pull pin mechanisms are fixed to the secondary beam mounting frame; S3, through pull rod mechanisms, the secondary beam mounting frame is tensioned and fixed by the main beam upper mounting frame, and the secondary beam mounting frame is supported and fixed by the main beam lower mounting frame; S4, two auxiliary mounting frames are fixed to the main beam; and S5, through four pull rod mechanisms, tensioning and fixing of the main beam upper mounting frame and the main beam lower mounting frame by the two auxiliary mounting frames are realized.
本发明涉及建筑施工领域,特别是涉及装配式建筑加固构件及其施工方法,该方法包括以下步骤:1、将主梁上安装架和主梁下安装架固定在主梁上,并将主梁上安装架和主梁下安装架连接固定,从而将主梁上安装架和主梁下安装架与主梁的连接固定;2、将次梁安装架固定在次梁上,同时将两个伸缩拉销机构固定在次梁安装架上;3、通过拉杆机构,实现主梁上安装架对次梁安装架的拉紧固定和主梁下安装架对次梁安装架的支撑固定;4、将两个辅助安装架固定在主梁上;5、通过四个拉杆机构,实现两个辅助安装架对主梁上安装架与主梁下安装架的拉紧固定。
The invention relates to the field of building construction, in particular to a fabricated building reinforcing component and a construction method thereof. The method comprises the following steps that S1, a main beam upper mounting frame and a main beam lower mounting frame are fixed to a main beam, and the main beam upper mounting frame and the main beam lower mounting frame are connected and fixed, and therefore, the main beam upper mounting frame and the main beam lower mounting frame are fixedly connected with the main beam; S2, a secondary beam mounting frame is fixed to a secondary beam, and meanwhile two telescopic pull pin mechanisms are fixed to the secondary beam mounting frame; S3, through pull rod mechanisms, the secondary beam mounting frame is tensioned and fixed by the main beam upper mounting frame, and the secondary beam mounting frame is supported and fixed by the main beam lower mounting frame; S4, two auxiliary mounting frames are fixed to the main beam; and S5, through four pull rod mechanisms, tensioning and fixing of the main beam upper mounting frame and the main beam lower mounting frame by the two auxiliary mounting frames are realized.
本发明涉及建筑施工领域,特别是涉及装配式建筑加固构件及其施工方法,该方法包括以下步骤:1、将主梁上安装架和主梁下安装架固定在主梁上,并将主梁上安装架和主梁下安装架连接固定,从而将主梁上安装架和主梁下安装架与主梁的连接固定;2、将次梁安装架固定在次梁上,同时将两个伸缩拉销机构固定在次梁安装架上;3、通过拉杆机构,实现主梁上安装架对次梁安装架的拉紧固定和主梁下安装架对次梁安装架的支撑固定;4、将两个辅助安装架固定在主梁上;5、通过四个拉杆机构,实现两个辅助安装架对主梁上安装架与主梁下安装架的拉紧固定。
Fabricated building anti-seismic reinforcing structure and construction method thereof
Europäisches Patentamt | 2024
|Fabricated building anti-seismic reinforcing structure and construction method thereof
Europäisches Patentamt | 2023
|Fabricated building part reinforcing structure and reinforcing method thereof
Europäisches Patentamt | 2023
|Fabricated building anti-seismic reinforcing structure and construction method thereof
Europäisches Patentamt | 2024
|Fabricated building component, fabricated building and construction method
Europäisches Patentamt | 2023
|