Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Underground engineering deep foundation pit steel support penetrating and post-dismantling connecting device and construction method
The invention discloses an underground engineering deep foundation pit steel support penetrating and post-dismantling connecting device and a construction method. the underground engineering deep foundation pit steel support penetrating and post-dismantling connecting device comprises a transverse upper steel support plate, a transverse lower steel support plate and two longitudinal steel supportplates, wherein a reinforcing assembly is arranged between the transverse upper steel support plate and the transverse lower steel support plate, the two longitudinal steel supporting plates are symmetrically and fixedly installed on the transverse upper steel supporting plate, the transverse lower steel supporting plate is located between the two longitudinal steel supporting plates, two installing cavities are symmetrically formed in the left end and the right end of the transverse lower steel supporting plate, a center rod is vertically and rotationally connected into each installing cavity, and a first gear is installed on each of the center rod. According to the underground engineering deep foundation pit steel support penetrating and post-dismantling connecting device and the construction method, the complexity of installing and uninstalling of the deep foundation pit steel support post-dismantling connecting device is reduced, time and labor are saved, and the construction speedand progress are increased.
本发明公开了一种贯穿地下工程深基坑钢支撑后拆连接装置及施工方法,包括横向上钢支撑板、横向下钢支撑板和两个纵向钢支撑板,所述横向上钢支撑板与横向下钢支撑板之间设置有加固组件,两个所述纵向钢支撑板对称固定安装在横向上钢支撑板上,所述横向下钢支撑板位于两个纵向钢支撑板之间,所述横向下钢支撑板的左右两端对称开设有两个安装腔,每个所述安装腔内均竖直转动连接有中心杆,每个所述中心杆上均固定安装有一号齿轮,本发明,减轻了深基坑钢支撑后拆的连接装置安装拆卸的复杂程度,省时省力,加快了施工的速度和进程。
Underground engineering deep foundation pit steel support penetrating and post-dismantling connecting device and construction method
The invention discloses an underground engineering deep foundation pit steel support penetrating and post-dismantling connecting device and a construction method. the underground engineering deep foundation pit steel support penetrating and post-dismantling connecting device comprises a transverse upper steel support plate, a transverse lower steel support plate and two longitudinal steel supportplates, wherein a reinforcing assembly is arranged between the transverse upper steel support plate and the transverse lower steel support plate, the two longitudinal steel supporting plates are symmetrically and fixedly installed on the transverse upper steel supporting plate, the transverse lower steel supporting plate is located between the two longitudinal steel supporting plates, two installing cavities are symmetrically formed in the left end and the right end of the transverse lower steel supporting plate, a center rod is vertically and rotationally connected into each installing cavity, and a first gear is installed on each of the center rod. According to the underground engineering deep foundation pit steel support penetrating and post-dismantling connecting device and the construction method, the complexity of installing and uninstalling of the deep foundation pit steel support post-dismantling connecting device is reduced, time and labor are saved, and the construction speedand progress are increased.
本发明公开了一种贯穿地下工程深基坑钢支撑后拆连接装置及施工方法,包括横向上钢支撑板、横向下钢支撑板和两个纵向钢支撑板,所述横向上钢支撑板与横向下钢支撑板之间设置有加固组件,两个所述纵向钢支撑板对称固定安装在横向上钢支撑板上,所述横向下钢支撑板位于两个纵向钢支撑板之间,所述横向下钢支撑板的左右两端对称开设有两个安装腔,每个所述安装腔内均竖直转动连接有中心杆,每个所述中心杆上均固定安装有一号齿轮,本发明,减轻了深基坑钢支撑后拆的连接装置安装拆卸的复杂程度,省时省力,加快了施工的速度和进程。
Underground engineering deep foundation pit steel support penetrating and post-dismantling connecting device and construction method
一种贯穿地下工程深基坑钢支撑后拆连接装置及施工方法
JIN SHUANGLING (Autor:in)
20.11.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2020
|Deep foundation pit trestle post-dismantling construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|Construction method for deep foundation pit penetrating underground permeable layer
Europäisches Patentamt | 2015
|