Installation structure design and installation method for groove plank bases of special-shaped bevel suspended ceiling
The invention provides an installation structure design and an installation method for groove plank bases of a special-shaped bevel suspended ceiling. The installation structure design comprises lightgage steel joists, main wooden keels and wood veneer. The multiple lightgage steel joists are fixedly connected with a top wall base layer and side wall base layers, the two ends of the main wooden keels are fixedly connected with the lightgage steel joists on the top wall base layer and the side wall base layers through bolts, the wood veneer is fixedly connected with the surfaces of the main wooden keels, and groove plank base mechanisms are clamped in square grooves. By means of bolted connection of the lightgage steel joists and the wooden keels, the characteristics of high structural strength of the lightgage steel joists and good plasticity of the wooden keels are combined, the structural strength is ensured, meanwhile the installation of various kinds of special-shaped bevel suspended ceilings is carried out, the universality is high, the structural strength is high, and the stability of an installation structure is high. After a groove structure is prefabricated on the ground and hung for installation, the situation that plans are suspended for splicing when the groove structure is installed is avoided, the installation process is simple, the installation efficiency is greatly improved, and thus the construction period is shortened.
本发明提供了一种异形斜面吊顶的凹槽木基层安装结构设计及其安装方法,其包括轻钢龙骨、主木龙骨和饰面板,轻钢龙骨为多根固定连接于顶墙基层和侧墙基层上,主木龙骨的两端通过螺栓分别固定连接在顶墙基层上和侧墙基层上的轻钢龙骨上,饰面板固定连接在主木龙骨的表面上,凹槽木基层机构卡接于方槽内。本发明通过轻钢龙骨和木龙骨的螺栓连接,使得轻钢龙骨结构强度高和木龙骨的可塑性好的特点相结合,在保证结构强度的同时进行各种异形斜面吊顶的安装,通用性强,结构强度高,安装结构稳定性高;通过凹槽结构地面预制后吊挂安装,避免了凹槽结构安装时悬空做木板拼接的情况,安装过程简单,极大地提高了安装效率,从而缩短了施工周期。
Installation structure design and installation method for groove plank bases of special-shaped bevel suspended ceiling
The invention provides an installation structure design and an installation method for groove plank bases of a special-shaped bevel suspended ceiling. The installation structure design comprises lightgage steel joists, main wooden keels and wood veneer. The multiple lightgage steel joists are fixedly connected with a top wall base layer and side wall base layers, the two ends of the main wooden keels are fixedly connected with the lightgage steel joists on the top wall base layer and the side wall base layers through bolts, the wood veneer is fixedly connected with the surfaces of the main wooden keels, and groove plank base mechanisms are clamped in square grooves. By means of bolted connection of the lightgage steel joists and the wooden keels, the characteristics of high structural strength of the lightgage steel joists and good plasticity of the wooden keels are combined, the structural strength is ensured, meanwhile the installation of various kinds of special-shaped bevel suspended ceilings is carried out, the universality is high, the structural strength is high, and the stability of an installation structure is high. After a groove structure is prefabricated on the ground and hung for installation, the situation that plans are suspended for splicing when the groove structure is installed is avoided, the installation process is simple, the installation efficiency is greatly improved, and thus the construction period is shortened.
本发明提供了一种异形斜面吊顶的凹槽木基层安装结构设计及其安装方法,其包括轻钢龙骨、主木龙骨和饰面板,轻钢龙骨为多根固定连接于顶墙基层和侧墙基层上,主木龙骨的两端通过螺栓分别固定连接在顶墙基层上和侧墙基层上的轻钢龙骨上,饰面板固定连接在主木龙骨的表面上,凹槽木基层机构卡接于方槽内。本发明通过轻钢龙骨和木龙骨的螺栓连接,使得轻钢龙骨结构强度高和木龙骨的可塑性好的特点相结合,在保证结构强度的同时进行各种异形斜面吊顶的安装,通用性强,结构强度高,安装结构稳定性高;通过凹槽结构地面预制后吊挂安装,避免了凹槽结构安装时悬空做木板拼接的情况,安装过程简单,极大地提高了安装效率,从而缩短了施工周期。
Installation structure design and installation method for groove plank bases of special-shaped bevel suspended ceiling
一种异形斜面吊顶的凹槽木基层安装结构设计及其安装方法
LI ZHIBO (Autor:in) / SU HEHUA (Autor:in) / GU XIAOFENG (Autor:in) / ZHAO CHUN (Autor:in) / WU GUANGDI (Autor:in) / ZHU BING (Autor:in) / LU YUBING (Autor:in) / ZHOU YA (Autor:in) / LU PING (Autor:in) / XU HUAQING (Autor:in)
24.11.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Europäisches Patentamt | 2023
|Suspended ceiling installation structure and installation method
Europäisches Patentamt | 2020
|Installation method of GRG special-shaped ceiling bell-mouth lamp groove
Europäisches Patentamt | 2021
|Suspended ceiling installation component, suspended ceiling assembly and installation method thereof
Europäisches Patentamt | 2021
|Fabricated suspended ceiling radiation installation module installation design structure
Europäisches Patentamt | 2021
|