Cast-in-place box girder integrated construction equipment and construction method thereof
The invention discloses cast-in-place box girder integrated construction equipment and a construction method thereof. The cast-in-place box girder integrated construction equipment comprises a machining workshop, a movable formwork, an on-girder trolley, a material distribution system, a ramming vibration system and a surface finishing system which are sequentially arranged in a longitudinal bridge direction of a cast-in-place box girder bridge surface. The machining workshop is used for processing a steel bar component required by the cast-in-place box girder; the movable formwork is used forforming a pouring formwork structure of a box girder segment to be poured; the on-girder trolley is used for transferring a template on a poured box girder section and the reinforcing steel bar component to a to-be-poured box girder section where the movable formwork is located; the material distribution system is used for pouring concrete; the ramming vibration system is used for tamping and vibrating concrete; and the surface finishing system is used for finishing and leveling the poured surfaces of the poured box girder sections after pouring. The equipment and the method can be widely applied to the technical field of building construction equipment.
本发明公开了一种现浇箱梁一体化建造设备及其施工方法,其包括沿现浇箱梁桥面的纵桥向依次设置的加工车间、移动模架、梁上台车、布料系统以及捣振系统和收面系统;所述加工车间用于加工现浇箱梁所需的钢筋部品;所述移动模架用于形成待浇筑箱梁节段的浇筑模板结构;所述梁上台车用于将已浇箱梁节段上的模板以及所述钢筋部品移运至所述移动模架所处的待浇箱梁节段处;所述布料系统用于混凝土浇筑;所述捣振系统用于混凝土捣振;所述收面系统用于浇筑后并捣振已浇筑箱梁节段浇筑面的收面和整平。可广泛应用于建筑施工设备技术领域。
Cast-in-place box girder integrated construction equipment and construction method thereof
The invention discloses cast-in-place box girder integrated construction equipment and a construction method thereof. The cast-in-place box girder integrated construction equipment comprises a machining workshop, a movable formwork, an on-girder trolley, a material distribution system, a ramming vibration system and a surface finishing system which are sequentially arranged in a longitudinal bridge direction of a cast-in-place box girder bridge surface. The machining workshop is used for processing a steel bar component required by the cast-in-place box girder; the movable formwork is used forforming a pouring formwork structure of a box girder segment to be poured; the on-girder trolley is used for transferring a template on a poured box girder section and the reinforcing steel bar component to a to-be-poured box girder section where the movable formwork is located; the material distribution system is used for pouring concrete; the ramming vibration system is used for tamping and vibrating concrete; and the surface finishing system is used for finishing and leveling the poured surfaces of the poured box girder sections after pouring. The equipment and the method can be widely applied to the technical field of building construction equipment.
本发明公开了一种现浇箱梁一体化建造设备及其施工方法,其包括沿现浇箱梁桥面的纵桥向依次设置的加工车间、移动模架、梁上台车、布料系统以及捣振系统和收面系统;所述加工车间用于加工现浇箱梁所需的钢筋部品;所述移动模架用于形成待浇筑箱梁节段的浇筑模板结构;所述梁上台车用于将已浇箱梁节段上的模板以及所述钢筋部品移运至所述移动模架所处的待浇箱梁节段处;所述布料系统用于混凝土浇筑;所述捣振系统用于混凝土捣振;所述收面系统用于浇筑后并捣振已浇筑箱梁节段浇筑面的收面和整平。可广泛应用于建筑施工设备技术领域。
Cast-in-place box girder integrated construction equipment and construction method thereof
一种现浇箱梁一体化建造设备及其施工方法
CHEN MING (Autor:in) / XUE ZHIWU (Autor:in) / SUN CE (Autor:in) / LI CHANGLIN (Autor:in) / WU JIANMING (Autor:in) / ZHENG HEHUI (Autor:in) / WANG MIN (Autor:in) / XIA XI (Autor:in) / LIU JINGHONG (Autor:in) / LIN GUOHUI (Autor:in)
27.11.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Cast-in-place box girder support system and cast-in-place box girder construction method