Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel beam high-altitude connecting plate and connecting method thereof
The invention discloses a steel beam high-altitude connecting plate and a connecting method thereof. The technical problems that in the prior art, high-altitude steel beam connection operation is inconvenient, high-altitude operation time is long, and potential safety hazards are large are solved. The connecting plate comprises a connecting plate main body, a movable connecting mechanism, a firstconnecting mechanism and a second connecting mechanism. The connecting method mainly comprises the steps that the connecting plate main body is arranged on a first steel beam, then after the first steel beam and a second steel beam are hoisted to connecting positions, the connecting plate main body is connected with the first steel beam and the second steel beam through bolts, the bolts are fastened after the movable connecting mechanism is dismantled, and the connecting is completed. According to the steel beam high-altitude connecting plate and the connecting method thereof, the connecting plate main body of a special structure is adopted, the connecting plate main body is arranged on one of the steel beams before high-altitude hoisting of the steel beams, connecting plate holes are adjusted to be aligned with steel beam holes one to one before arrangement, after the two sections of steel beams are hoisted in place at high altitude, the connecting plate main body is unfolded, the bolts are arranged, then the two sections of steel beams can be connected and fixed, operation is easy and convenient, efficiency is high, the high-altitude operation duration can be effectively shortened, and high-altitude operation potential safety hazards are reduced.
本发明公开了一种钢梁高空连接板及其连接方法,解决现有技术高空钢梁连接操作不方便、高空作业时间长、以及安全隐患大的技术问题。本发明包括连接板主体、活动连接机构、第一连接机构和第二连接机构。连接方法主要为先将连接板主体安装至第一钢梁上,再吊装第一钢梁和第二钢梁至连接位后,用螺栓将连接板主体与第一钢梁和第二钢梁连接,拆除活动连接机构后紧固螺栓,即可。本发明采用特殊结构的连接板,在钢梁高空吊装前,先将连接板安装在其中一段钢梁上,安装前先调整连接板孔与这段钢梁孔一一对齐,当两段钢梁高空吊装到位后,打开连接板装上螺栓,就可以将两段钢梁连接固定,操作简便效率高,可有效减少高空作业时长,降低高空作业安全隐患。
Steel beam high-altitude connecting plate and connecting method thereof
The invention discloses a steel beam high-altitude connecting plate and a connecting method thereof. The technical problems that in the prior art, high-altitude steel beam connection operation is inconvenient, high-altitude operation time is long, and potential safety hazards are large are solved. The connecting plate comprises a connecting plate main body, a movable connecting mechanism, a firstconnecting mechanism and a second connecting mechanism. The connecting method mainly comprises the steps that the connecting plate main body is arranged on a first steel beam, then after the first steel beam and a second steel beam are hoisted to connecting positions, the connecting plate main body is connected with the first steel beam and the second steel beam through bolts, the bolts are fastened after the movable connecting mechanism is dismantled, and the connecting is completed. According to the steel beam high-altitude connecting plate and the connecting method thereof, the connecting plate main body of a special structure is adopted, the connecting plate main body is arranged on one of the steel beams before high-altitude hoisting of the steel beams, connecting plate holes are adjusted to be aligned with steel beam holes one to one before arrangement, after the two sections of steel beams are hoisted in place at high altitude, the connecting plate main body is unfolded, the bolts are arranged, then the two sections of steel beams can be connected and fixed, operation is easy and convenient, efficiency is high, the high-altitude operation duration can be effectively shortened, and high-altitude operation potential safety hazards are reduced.
本发明公开了一种钢梁高空连接板及其连接方法,解决现有技术高空钢梁连接操作不方便、高空作业时间长、以及安全隐患大的技术问题。本发明包括连接板主体、活动连接机构、第一连接机构和第二连接机构。连接方法主要为先将连接板主体安装至第一钢梁上,再吊装第一钢梁和第二钢梁至连接位后,用螺栓将连接板主体与第一钢梁和第二钢梁连接,拆除活动连接机构后紧固螺栓,即可。本发明采用特殊结构的连接板,在钢梁高空吊装前,先将连接板安装在其中一段钢梁上,安装前先调整连接板孔与这段钢梁孔一一对齐,当两段钢梁高空吊装到位后,打开连接板装上螺栓,就可以将两段钢梁连接固定,操作简便效率高,可有效减少高空作业时长,降低高空作业安全隐患。
Steel beam high-altitude connecting plate and connecting method thereof
一种钢梁高空连接板及其连接方法
LI LI (Autor:in) / TANG LI (Autor:in) / JIANG YOURONG (Autor:in) / LI YIFENG (Autor:in) / GUO HAO (Autor:in) / LIU QINGSHAN (Autor:in)
27.11.2020
Patent
Elektronische Ressource
Chinesisch
High-altitude profile steel beam connecting corridor construction method
Europäisches Patentamt | 2021
|Steel beam connecting plate mounting device and steel beam connecting plate mounting method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Steel frame beam column connecting structure and connecting method thereof
Europäisches Patentamt | 2022
|Steel beam connecting joint structure and steel beam connecting method
Europäisches Patentamt | 2024
|