The invention provides a cement clinker processing technology. Operation is completed through cooperation of a bottom frame, a feeding port, a drying unit, a pushing unit and a discharging port. According to the invention, a large amount of raw materials can be simultaneously conveyed to a conveying cylinder, the front raw materials do not roll off smoothly, blockage due to fact that a rolling path of the rear raw material is easily blocked is avoided, when the raw materials roll down, due to the fact that the amount of the conveyed raw materials is large, the raw materials located in the inner core part of the raw material layer are often not fully dried after passing through the conveying cylinder due to the fact that the raw materials are located in a deep inner layer, and even the situation that the raw materials are not baked occurs to severe people.
本发明提供了一种水泥熟料加工工艺,由底架、进料口、烘干单元、推送单元和出料口配合完成的作业,本发明可以解决大量的原料同时输送到输送筒时,由于前方的原料未顺利滚落,容易堵住后方原料的滚落路径,从而造成堵塞的情况,且滚落时,由于输送的原料量大,位于原料层内芯部分的原料由于深处内层,往往在经过输送筒后仍未得到充分烘干,严重者甚至出现未被烘烤到的情况等问题。
The invention provides a cement clinker processing technology. Operation is completed through cooperation of a bottom frame, a feeding port, a drying unit, a pushing unit and a discharging port. According to the invention, a large amount of raw materials can be simultaneously conveyed to a conveying cylinder, the front raw materials do not roll off smoothly, blockage due to fact that a rolling path of the rear raw material is easily blocked is avoided, when the raw materials roll down, due to the fact that the amount of the conveyed raw materials is large, the raw materials located in the inner core part of the raw material layer are often not fully dried after passing through the conveying cylinder due to the fact that the raw materials are located in a deep inner layer, and even the situation that the raw materials are not baked occurs to severe people.
本发明提供了一种水泥熟料加工工艺,由底架、进料口、烘干单元、推送单元和出料口配合完成的作业,本发明可以解决大量的原料同时输送到输送筒时,由于前方的原料未顺利滚落,容易堵住后方原料的滚落路径,从而造成堵塞的情况,且滚落时,由于输送的原料量大,位于原料层内芯部分的原料由于深处内层,往往在经过输送筒后仍未得到充分烘干,严重者甚至出现未被烘烤到的情况等问题。
Cement clinker and processing technology of cement clinker
Europäisches Patentamt | 2021
|MANUFACTURING METHOD OF CEMENT CLINKER, CEMENT CLINKER AND CEMENT
Europäisches Patentamt | 2015
|CEMENT CLINKER, CEMENT COMPOSITION, AND CEMENT CLINKER PRODUCTION METHOD
Europäisches Patentamt | 2021
|Cement clinker, cement composition, and cement clinker production method
Europäisches Patentamt | 2022
|