Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction process of ultra-small-spacing double-limb pier stud
The application relates to a construction process of an ultra-small-interval double-limb pier stud. The construction process comprises the following construction steps that S100, positioning holes fordouble-limb pier column pouring are dug, and double-limb pier column formworks are installed around the peripheries of the positioning holes; S200, quick-setting concrete is prepared on site; S300, quick-setting concrete is poured into the positioning holes and an inner cavity of the formwork, the double-limb pier column in the solidified state is maintained, and the formwork is detached after the double-limb pier column reaches a certain strength; and S400, the forming quality of the double-limb pier stud is detected and the double-limb pier stud is accepted, and delivered. The constructionprocess has the effect of effectively shortening the forming period of the double-limb pier stud.
本申请涉及一种超小间距双肢墩柱施工工艺,其包括如下施工步骤:S100、挖设双肢墩柱浇筑用定位孔,围绕定位孔外周安装双肢墩柱模板;S200、现场制备速凝混凝土;S300、在定位孔及模板内腔浇筑速凝混凝土,对固结状态的双肢墩柱养生,在双肢墩柱达到一定强度后拆除模板;S400、检测双肢墩柱成型质量,验收并交付。本申请具有有效缩短了双肢墩柱的成型周期的效果。
Construction process of ultra-small-spacing double-limb pier stud
The application relates to a construction process of an ultra-small-interval double-limb pier stud. The construction process comprises the following construction steps that S100, positioning holes fordouble-limb pier column pouring are dug, and double-limb pier column formworks are installed around the peripheries of the positioning holes; S200, quick-setting concrete is prepared on site; S300, quick-setting concrete is poured into the positioning holes and an inner cavity of the formwork, the double-limb pier column in the solidified state is maintained, and the formwork is detached after the double-limb pier column reaches a certain strength; and S400, the forming quality of the double-limb pier stud is detected and the double-limb pier stud is accepted, and delivered. The constructionprocess has the effect of effectively shortening the forming period of the double-limb pier stud.
本申请涉及一种超小间距双肢墩柱施工工艺,其包括如下施工步骤:S100、挖设双肢墩柱浇筑用定位孔,围绕定位孔外周安装双肢墩柱模板;S200、现场制备速凝混凝土;S300、在定位孔及模板内腔浇筑速凝混凝土,对固结状态的双肢墩柱养生,在双肢墩柱达到一定强度后拆除模板;S400、检测双肢墩柱成型质量,验收并交付。本申请具有有效缩短了双肢墩柱的成型周期的效果。
Construction process of ultra-small-spacing double-limb pier stud
一种超小间距双肢墩柱施工工艺
HUANG XIUFEI (Autor:in) / YU JIANJUN (Autor:in)
01.12.2020
Patent
Elektronische Ressource
Chinesisch
Pier stud fair-faced concrete construction method and pier stud
Europäisches Patentamt | 2020
|Pier stud template positioning device for bridge pier stud construction and using method thereof
Europäisches Patentamt | 2021
|Bridge pier stud and pier stud joint structure thereof
Europäisches Patentamt | 2020
|