Waterproof protection construction method
The invention discloses a waterproof protection construction method which comprises the following steps: spraying enough water on the surface of a cement base material to wet the cement base material,and uniformly spraying a waterproof material for the first time after the surface of the cement base material has no open water; after the waterproof material is sprayed for 3-5 hours for the first time, spraying water mist for maintenance, and spraying water mist for maintenance again after 4-6 hours; spraying water mist on the surface of the cement base material constructed in the previous dayfor maintenance on the second day, and spraying a waterproof material for the second time after 2-4 hours and no open water exists on the surface of the cement base material; after the waterproof material is sprayed for the second time, conducting water mist spraying maintenance after 4-6 hours, conducting water mist spraying maintenance for the second time after 4-6 hours, and completing the construction process. The waterproof material contains nano calcium silicate. A new concrete waterproof mode is provided, the construction process is easy to operate, and the waterproof and anti-seepage state is rapidly achieved after construction.
本申请公开了一种防水保护的施工方法,包括以下步骤:在水泥基材表面喷足量水使其润湿,待水泥基材表面无明水后,均匀喷第一遍防水材料;第一遍防水材料喷完3‑5小时后,喷水雾养护,间隔4‑6小时后喷水雾再养护;第二天先在前一天施工好的水泥基材表面喷水雾养护,2‑4小时后,待水泥基材表面无明水后,喷第二遍防水材料;第二遍防水材料喷完后,间隔4‑6小时后喷水雾养护,再间隔4‑6小时后喷水雾养护第二次,完成施工过程;所述防水材料中含有纳米硅酸钙。本申请提供了一种新的混凝土防水模式,施工过程操作简单,施工后快速达到防水抗渗状态。
Waterproof protection construction method
The invention discloses a waterproof protection construction method which comprises the following steps: spraying enough water on the surface of a cement base material to wet the cement base material,and uniformly spraying a waterproof material for the first time after the surface of the cement base material has no open water; after the waterproof material is sprayed for 3-5 hours for the first time, spraying water mist for maintenance, and spraying water mist for maintenance again after 4-6 hours; spraying water mist on the surface of the cement base material constructed in the previous dayfor maintenance on the second day, and spraying a waterproof material for the second time after 2-4 hours and no open water exists on the surface of the cement base material; after the waterproof material is sprayed for the second time, conducting water mist spraying maintenance after 4-6 hours, conducting water mist spraying maintenance for the second time after 4-6 hours, and completing the construction process. The waterproof material contains nano calcium silicate. A new concrete waterproof mode is provided, the construction process is easy to operate, and the waterproof and anti-seepage state is rapidly achieved after construction.
本申请公开了一种防水保护的施工方法,包括以下步骤:在水泥基材表面喷足量水使其润湿,待水泥基材表面无明水后,均匀喷第一遍防水材料;第一遍防水材料喷完3‑5小时后,喷水雾养护,间隔4‑6小时后喷水雾再养护;第二天先在前一天施工好的水泥基材表面喷水雾养护,2‑4小时后,待水泥基材表面无明水后,喷第二遍防水材料;第二遍防水材料喷完后,间隔4‑6小时后喷水雾养护,再间隔4‑6小时后喷水雾养护第二次,完成施工过程;所述防水材料中含有纳米硅酸钙。本申请提供了一种新的混凝土防水模式,施工过程操作简单,施工后快速达到防水抗渗状态。
Waterproof protection construction method
一种防水保护的施工方法
WEN QI (Autor:in) / WEN YAN (Autor:in) / LIU YANFEI (Autor:in) / XU JIANYUE (Autor:in) / GENG ZEYU (Autor:in)
04.12.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
C04B
Kalk
,
LIME
Precast Waterproof Protection Block and Construction Method Waterproof Protection
Europäisches Patentamt | 2024
|Waterproof protection and waterproof construction method using the same
Europäisches Patentamt | 2018
Waterproof protection and waterproof construction method using the same
Europäisches Patentamt | 2019
|Waterproof protection and waterproof construction method using the same
Europäisches Patentamt | 2020
Waterproof protection and waterproof construction method using the same
Europäisches Patentamt | 2017
|