Pipe gallery inner support with embedded column double-face overlapped side wall and installation method of pipe gallery inner support
The invention belongs to the technical field of pipe gallery devices, and discloses a pipe gallery inner support with an embedded column double-face overlapped side wall and an installation method ofthe pipe gallery inner support. The pipe gallery inner support with the embedded column double-face overlapped side wall comprises the double-face overlapped side wall, an overlapped top plate, an overlapped bottom plate, inclined struts and detachable connecting bases, wherein the inclined struts are connected with the side wall and the top plate, and the side wall and the bottom plate; and the connecting bases are arranged between the inclined struts and the inner side wall and between the inclined struts and the outer side wall for connection and fixation. Compared with an original pipe gallery supporting technology, the problems that in the prior art, haunch corner construction is difficult, and the installation site is limited by the site gradient in construction are solved, pipe gallery construction is more convenient, the site construction procedures are remarkably reduced, the site construction cost is low, the construction efficiency is high, hoisting and installation are convenient, the formwork dismounting procedure is reduced, the construction operation period is shortened, most tools can be dismounted and repeatedly used, the engineering construction cost is reduced, economic benefits are improved, and certain improvement is achieved for environment protection.
本发明属于管廊装置技术领域,公开了一种带暗柱双面叠合侧墙的管廊内撑及其安装方法,带暗柱双面叠合侧墙的管廊内撑包括双面叠合侧墙、叠合顶板和叠合底板,以及连接侧墙和顶板、侧墙和底板的斜撑和可拆卸的连接座,在斜撑与内、外侧墙间均有设置连接座进行连接固定。本发明相对于原有的管廊支撑技术,解决了现有技术中腋角施工较为困难,安装场地收场地坡度对施工中的限制,使得管廊施工更加方便,现场施工工序显著减少,现场施工成本较低,并且施工效率较高,便于吊运和安装,减少了模板拆除工序,缩短了施工作业周期,大部分用具可以拆卸重复使用,降低了工程建设成本,提高经济效益,对环境保护有一定的提升。
Pipe gallery inner support with embedded column double-face overlapped side wall and installation method of pipe gallery inner support
The invention belongs to the technical field of pipe gallery devices, and discloses a pipe gallery inner support with an embedded column double-face overlapped side wall and an installation method ofthe pipe gallery inner support. The pipe gallery inner support with the embedded column double-face overlapped side wall comprises the double-face overlapped side wall, an overlapped top plate, an overlapped bottom plate, inclined struts and detachable connecting bases, wherein the inclined struts are connected with the side wall and the top plate, and the side wall and the bottom plate; and the connecting bases are arranged between the inclined struts and the inner side wall and between the inclined struts and the outer side wall for connection and fixation. Compared with an original pipe gallery supporting technology, the problems that in the prior art, haunch corner construction is difficult, and the installation site is limited by the site gradient in construction are solved, pipe gallery construction is more convenient, the site construction procedures are remarkably reduced, the site construction cost is low, the construction efficiency is high, hoisting and installation are convenient, the formwork dismounting procedure is reduced, the construction operation period is shortened, most tools can be dismounted and repeatedly used, the engineering construction cost is reduced, economic benefits are improved, and certain improvement is achieved for environment protection.
本发明属于管廊装置技术领域,公开了一种带暗柱双面叠合侧墙的管廊内撑及其安装方法,带暗柱双面叠合侧墙的管廊内撑包括双面叠合侧墙、叠合顶板和叠合底板,以及连接侧墙和顶板、侧墙和底板的斜撑和可拆卸的连接座,在斜撑与内、外侧墙间均有设置连接座进行连接固定。本发明相对于原有的管廊支撑技术,解决了现有技术中腋角施工较为困难,安装场地收场地坡度对施工中的限制,使得管廊施工更加方便,现场施工工序显著减少,现场施工成本较低,并且施工效率较高,便于吊运和安装,减少了模板拆除工序,缩短了施工作业周期,大部分用具可以拆卸重复使用,降低了工程建设成本,提高经济效益,对环境保护有一定的提升。
Pipe gallery inner support with embedded column double-face overlapped side wall and installation method of pipe gallery inner support
一种带暗柱双面叠合侧墙的管廊内撑及其安装方法
MAO ZUOCAI (Autor:in) / HUANG QIANG (Autor:in) / GU YIN (Autor:in) / YU BOLIN (Autor:in) / ZHANG LIANG (Autor:in) / YANG SHUN (Autor:in) / LIN WEICHAO (Autor:in)
04.12.2020
Patent
Elektronische Ressource
Chinesisch