Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete seasonal construction maintenance process
The invention relates to a concrete seasonal construction maintenance process. The process comprises the following method of winter construction maintenance. The method comprises the steps that 1, concrete is poured, wherein portland cement or ordinary portland cement is added into concrete to prepare the concrete, so that the concrete cannot be frozen before the compressive strength of the concrete reaches 30% of the designed strength, and meanwhile an anti-freezing agent is added into a concrete mixture; 2, concrete heat insulation is carried out, wherein heat insulation is carried out on the concrete through a heat storage method or a house heating method; and 3, concrete maintenance is carried out. By means of the process, the phenomenon that construction stops in hot summer or winteris avoided, and normal operation of construction is guaranteed; the temperature of the concrete is guaranteed in winter, and freezing of the concrete is avoided; in summer, the temperature of the concrete is reduced by reducing the temperature of concrete raw materials; and through roughening on old concrete, the contact surface of the old concrete and new concrete is increased, so that the new concrete can be conveniently bonded to the old concrete.
本发明涉及一种混凝土季节性施工养护工艺,包括以下方法:冬季施工养护;步骤1、混凝土的浇筑;在混凝土中添加硅酸盐水泥或普通硅酸盐水泥配制混凝土,使其抗压强度达到设计强度的30%前不得受冻,同时在混凝土拌合料中添加防冻剂;步骤2、混凝土保温;通过蓄热法或暖棚法对混凝土进行保温;步骤3、混凝土养护;本发明避免炎热夏季或冬季出现施工停止现象,保障了施工的正常运行;在冬季保障了混凝土的温度,避免混凝土的冻结;在夏季,通过降低混凝土原材料温度,从而降低混凝土的温度;通过在旧混凝土上进行凿毛,提高旧混凝土与新混凝土的接触面,从而便于新混凝土粘合在旧混凝土上。
Concrete seasonal construction maintenance process
The invention relates to a concrete seasonal construction maintenance process. The process comprises the following method of winter construction maintenance. The method comprises the steps that 1, concrete is poured, wherein portland cement or ordinary portland cement is added into concrete to prepare the concrete, so that the concrete cannot be frozen before the compressive strength of the concrete reaches 30% of the designed strength, and meanwhile an anti-freezing agent is added into a concrete mixture; 2, concrete heat insulation is carried out, wherein heat insulation is carried out on the concrete through a heat storage method or a house heating method; and 3, concrete maintenance is carried out. By means of the process, the phenomenon that construction stops in hot summer or winteris avoided, and normal operation of construction is guaranteed; the temperature of the concrete is guaranteed in winter, and freezing of the concrete is avoided; in summer, the temperature of the concrete is reduced by reducing the temperature of concrete raw materials; and through roughening on old concrete, the contact surface of the old concrete and new concrete is increased, so that the new concrete can be conveniently bonded to the old concrete.
本发明涉及一种混凝土季节性施工养护工艺,包括以下方法:冬季施工养护;步骤1、混凝土的浇筑;在混凝土中添加硅酸盐水泥或普通硅酸盐水泥配制混凝土,使其抗压强度达到设计强度的30%前不得受冻,同时在混凝土拌合料中添加防冻剂;步骤2、混凝土保温;通过蓄热法或暖棚法对混凝土进行保温;步骤3、混凝土养护;本发明避免炎热夏季或冬季出现施工停止现象,保障了施工的正常运行;在冬季保障了混凝土的温度,避免混凝土的冻结;在夏季,通过降低混凝土原材料温度,从而降低混凝土的温度;通过在旧混凝土上进行凿毛,提高旧混凝土与新混凝土的接触面,从而便于新混凝土粘合在旧混凝土上。
Concrete seasonal construction maintenance process
一种混凝土季节性施工养护工艺
LU BIN (Autor:in) / DENG YUANXIN (Autor:in) / QIN ZHENGHE (Autor:in) / OUYANG BO (Autor:in) / ZHANG LIWEN (Autor:in) / LIU JIAOQI (Autor:in) / CHAI BO (Autor:in) / PENG HAO (Autor:in) / YANG PENG (Autor:in)
08.12.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Building construction concrete coating maintenance device
Europäisches Patentamt | 2023
|Concrete maintenance device for building construction
Europäisches Patentamt | 2024
|Concrete maintenance device for building construction
Europäisches Patentamt | 2024
|Concrete maintenance device for building construction
Europäisches Patentamt | 2024
|