Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention belongs to the technical field of building engineering tools, and particularly relates to a pre-embedding positioning device for a building structure preset hole. The pre-embedding positioning device comprises two mounting frames, wherein the two mounting frames are fixedly connected with supporting frames, and one of the side walls of the two supporting frames is fixedly connected with a fixing block; a tension spring is stretched by pulling a pulling block, so that two positioning blocks are driven to slide in a through hole, an inserting block is inserted into a clamping block, and pulling of the pulling block is relieved after the inserting block enters the clamping block; the positioning blocks enter positioning holes through the resilience force of the tension spring tolock the inserting block, so that the connecting positions of the two mounting frames are stable; and water is added into a bearing box to achieve the bearing effect, then two electric push rods areused for pushing a limiting sliding block, so that a second connecting block and a first connecting block move towards the position of a steel pipe, the steel pipe is positioned through the first connecting block and the second connecting block, and the installation operation is simple.
本发明属于建筑工程用具技术领域,尤其为建筑结构预设孔的预埋定位装置,包括安装架,所述安装架的数量为两个,两个所述安装架均固定连接有支撑架,两个所述支撑架的一侧壁均固定连接有固定块;通过对拉动块拉动使得拉簧伸展,从而带动两个定位块在通孔内滑动,将插接块穿插进入卡接块之中,在插接块进入卡接块后解除对拉动块的拉动,通过拉簧的回弹力使得定位块进入定位孔之中实现对插接块的锁定,使得两个安装架实现连接位置稳定,之后通过将承重箱内加入水起到承重作用,之后通过两个电动推杆来推动限位滑块,使得第二连接块和第一连接块向钢管位置移动,通过第一连接块和第二连接块对钢管进行定位,安装操作简单。
The invention belongs to the technical field of building engineering tools, and particularly relates to a pre-embedding positioning device for a building structure preset hole. The pre-embedding positioning device comprises two mounting frames, wherein the two mounting frames are fixedly connected with supporting frames, and one of the side walls of the two supporting frames is fixedly connected with a fixing block; a tension spring is stretched by pulling a pulling block, so that two positioning blocks are driven to slide in a through hole, an inserting block is inserted into a clamping block, and pulling of the pulling block is relieved after the inserting block enters the clamping block; the positioning blocks enter positioning holes through the resilience force of the tension spring tolock the inserting block, so that the connecting positions of the two mounting frames are stable; and water is added into a bearing box to achieve the bearing effect, then two electric push rods areused for pushing a limiting sliding block, so that a second connecting block and a first connecting block move towards the position of a steel pipe, the steel pipe is positioned through the first connecting block and the second connecting block, and the installation operation is simple.
本发明属于建筑工程用具技术领域,尤其为建筑结构预设孔的预埋定位装置,包括安装架,所述安装架的数量为两个,两个所述安装架均固定连接有支撑架,两个所述支撑架的一侧壁均固定连接有固定块;通过对拉动块拉动使得拉簧伸展,从而带动两个定位块在通孔内滑动,将插接块穿插进入卡接块之中,在插接块进入卡接块后解除对拉动块的拉动,通过拉簧的回弹力使得定位块进入定位孔之中实现对插接块的锁定,使得两个安装架实现连接位置稳定,之后通过将承重箱内加入水起到承重作用,之后通过两个电动推杆来推动限位滑块,使得第二连接块和第一连接块向钢管位置移动,通过第一连接块和第二连接块对钢管进行定位,安装操作简单。
Europäisches Patentamt | 2022
|Preset positioning block and construction method thereof
Europäisches Patentamt | 2020
|Preset building wall connecting device and using method thereof
Europäisches Patentamt | 2021
|Building decorative wallboard with preset floor heating pipe
Europäisches Patentamt | 2020
|