Continuous casting circulating water pump house equipment foundation serialization computerization combination modeling method
The invention provides a continuous casting circulating water pump house equipment foundation serialization computerization combination modeling method. The method comprises the steps of building continuous casting circulating water pump house foundation slab primitives with special-shaped area sections; drawing continuous casting circulating water pump house wall primitives on the continuous casting circulating water pump house foundation slab primitives; arranging and adjusting the bent anchors of the stressed steel bars between the foundation slab and the rectangular bearing platform; setting and adjusting steel bars in the inequilateral three-pile bearing platform; setting and adjusting steel bars in the overlapped foundation; drawing a cable trench primitive on the foundation slab primitive, and carrying out arrangement adjustment on steel bars in the cable trench; and drawing double-layer two-way stressed steel bars on the bottom slope primitives. According to the invention, reinforcement fine adjustment is carried out after calculation combined modeling is carried out on an unconventional structure in the continuous casting circulating water pump house equipment foundation,calculation of the reinforced concrete formwork is completed while one-time calculation modeling is carried out, the defects of repeated calculation and missing calculation are overcome, and an accurate basis is provided for construction, binding and the like depending on a BIM model.
本发明提供了一种连铸循环水泵房设备基础系列化电算组合建模方法,包括:建立具有异形区域截面的连铸循环水泵房基础底板图元;在连铸循环水泵房基础底板图元上绘制连铸循环水泵房墙体图元;对基础底板与矩形承台之间的受力钢筋弯锚进行布置调整;对不等边三桩承台中的钢筋进行布置调整;对重叠基础中的钢筋进行布置调整;在基础底板图元上绘制电缆沟图元,并对电缆沟中的钢筋进行布置调整;在底部斜坡图元上绘制双层双向受力钢筋。本发明对连铸循环水泵房设备基础中的非常规构造进行电算组合建模后进行钢筋精细化调整,一次性电算建模同时完成了钢筋混凝土模板计算,避免了重复计算与漏算的弊端,给依托BIM模型的施工、绑扎等提供了精确依据。
Continuous casting circulating water pump house equipment foundation serialization computerization combination modeling method
The invention provides a continuous casting circulating water pump house equipment foundation serialization computerization combination modeling method. The method comprises the steps of building continuous casting circulating water pump house foundation slab primitives with special-shaped area sections; drawing continuous casting circulating water pump house wall primitives on the continuous casting circulating water pump house foundation slab primitives; arranging and adjusting the bent anchors of the stressed steel bars between the foundation slab and the rectangular bearing platform; setting and adjusting steel bars in the inequilateral three-pile bearing platform; setting and adjusting steel bars in the overlapped foundation; drawing a cable trench primitive on the foundation slab primitive, and carrying out arrangement adjustment on steel bars in the cable trench; and drawing double-layer two-way stressed steel bars on the bottom slope primitives. According to the invention, reinforcement fine adjustment is carried out after calculation combined modeling is carried out on an unconventional structure in the continuous casting circulating water pump house equipment foundation,calculation of the reinforced concrete formwork is completed while one-time calculation modeling is carried out, the defects of repeated calculation and missing calculation are overcome, and an accurate basis is provided for construction, binding and the like depending on a BIM model.
本发明提供了一种连铸循环水泵房设备基础系列化电算组合建模方法,包括:建立具有异形区域截面的连铸循环水泵房基础底板图元;在连铸循环水泵房基础底板图元上绘制连铸循环水泵房墙体图元;对基础底板与矩形承台之间的受力钢筋弯锚进行布置调整;对不等边三桩承台中的钢筋进行布置调整;对重叠基础中的钢筋进行布置调整;在基础底板图元上绘制电缆沟图元,并对电缆沟中的钢筋进行布置调整;在底部斜坡图元上绘制双层双向受力钢筋。本发明对连铸循环水泵房设备基础中的非常规构造进行电算组合建模后进行钢筋精细化调整,一次性电算建模同时完成了钢筋混凝土模板计算,避免了重复计算与漏算的弊端,给依托BIM模型的施工、绑扎等提供了精确依据。
Continuous casting circulating water pump house equipment foundation serialization computerization combination modeling method
一种连铸循环水泵房设备基础系列化电算组合建模方法
SONG SAIZHONG (Autor:in) / AN JIFU (Autor:in) / ZHANG TING (Autor:in) / ZHANG SHUFENG (Autor:in) / JIN LIAODONG (Autor:in) / ZHAO JIAN (Autor:in)
15.12.2020
Patent
Elektronische Ressource
Chinesisch
Construction method for deep foundation pit of seaside circulating water pump house
Europäisches Patentamt | 2023
|Emerging Standards For Water Utility Computerization
Wiley | 1993
|Europäisches Patentamt | 2022
|Computerization of landscape planning
Elsevier | 1987
|Foundation segmented construction method of continuous casting machine main body equipment
Europäisches Patentamt | 2022
|