Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Buoy leveling pile gripper
The invention provides a buoy leveling pile gripper which ensures the precision of the pile gripper, enhances the universality of the pile gripper, and enables the pile gripper to be suitable for different water depths on the premise of not increasing the stress of a soil layer. The buoy leveling pile gripper comprises four positioning piles which are parallel to one another and arranged in a rectangular shape, and an upper section, a middle section and a bottom section are sequentially arranged in the height direction of the positioning piles from top to bottom; the upper section comprise a set of laterally-protruding surrounding platforms and is further provided with an equipment platform, the bottom of the upper section is connected with a flange, corresponding to the upper position, ofthe middle section through a flange, a flange, corresponding to the lower position, of the middle section is connected with a flange, corresponding to the top position, of the bottom section, and theheight of the middle section is designed according to water depth configuration; and leveling buoys are arranged at the two sides, corresponding to laterally-protruding areas of the surrounding platforms, of the bottom section respectively, the leveling buoys are externally connected with water pipes, vent pipes are connected to the equipment platform in the upper section, and an anti-sinking plate is fixed to the bottom of the bottom section.
本发明提供了一种浮筒调平抱桩器,其保证抱桩器自身精度、且增强抱桩器的通用性,在不增加土层的受力的前提下使得抱桩器适用于不同水深。其包括四根互相平行、且排列为矩形形状的定位桩,沿着定位桩的高度方向自上而下顺次布置有上部分段、中部分段、底部分段;上部分段包括有一组侧凸的环抱平台,上部分段还布置有设备平台,上部分段的底部通过法兰连接中部分段的对应上部位置的法兰,中部分段的对应下部位置法兰连接底部分段的顶部位置法兰,中部分段的高度根据水深配置设计,底部分段的对应于环抱平台的侧凸区域的两侧分别设置有调平浮筒,调平浮筒外接有水管、透气管连接至上部分段内的设备平台,底部分段的底部固定有防沉板。
Buoy leveling pile gripper
The invention provides a buoy leveling pile gripper which ensures the precision of the pile gripper, enhances the universality of the pile gripper, and enables the pile gripper to be suitable for different water depths on the premise of not increasing the stress of a soil layer. The buoy leveling pile gripper comprises four positioning piles which are parallel to one another and arranged in a rectangular shape, and an upper section, a middle section and a bottom section are sequentially arranged in the height direction of the positioning piles from top to bottom; the upper section comprise a set of laterally-protruding surrounding platforms and is further provided with an equipment platform, the bottom of the upper section is connected with a flange, corresponding to the upper position, ofthe middle section through a flange, a flange, corresponding to the lower position, of the middle section is connected with a flange, corresponding to the top position, of the bottom section, and theheight of the middle section is designed according to water depth configuration; and leveling buoys are arranged at the two sides, corresponding to laterally-protruding areas of the surrounding platforms, of the bottom section respectively, the leveling buoys are externally connected with water pipes, vent pipes are connected to the equipment platform in the upper section, and an anti-sinking plate is fixed to the bottom of the bottom section.
本发明提供了一种浮筒调平抱桩器,其保证抱桩器自身精度、且增强抱桩器的通用性,在不增加土层的受力的前提下使得抱桩器适用于不同水深。其包括四根互相平行、且排列为矩形形状的定位桩,沿着定位桩的高度方向自上而下顺次布置有上部分段、中部分段、底部分段;上部分段包括有一组侧凸的环抱平台,上部分段还布置有设备平台,上部分段的底部通过法兰连接中部分段的对应上部位置的法兰,中部分段的对应下部位置法兰连接底部分段的顶部位置法兰,中部分段的高度根据水深配置设计,底部分段的对应于环抱平台的侧凸区域的两侧分别设置有调平浮筒,调平浮筒外接有水管、透气管连接至上部分段内的设备平台,底部分段的底部固定有防沉板。
Buoy leveling pile gripper
一种浮筒调平抱桩器
LI FEI (Autor:in) / WANG JIANGUO (Autor:in) / GE BIN (Autor:in) / ZHU JUNFENG (Autor:in) / CHEN XIAOFEI (Autor:in) / ZHOU FENG (Autor:in)
18.12.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|Leveling assembly and leveling method for pile foundation construction
Europäisches Patentamt | 2023
|Pile gripper for offshore wind power single pile foundation construction
Europäisches Patentamt | 2024
|Automatic pile gripper and control method for automatic pile holding
Europäisches Patentamt | 2021
|