Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel sheet pile cofferdam structure and construction method thereof
The invention relates to a steel sheet pile cofferdam structure. The steel sheet pile cofferdam structure comprises a plurality of cofferdam units, wherein the plurality of cofferdam units are sequentially connected end to end to form a cofferdam, each cofferdam unit comprises a first connecting block, a second connecting block, a steel sheet pile, a first clamping block and a fixing mechanism, the first clamping blocks are arranged on one sides of the steel sheet piles, and first clamping grooves clamped to the first clamping blocks are formed in the other sides of the steel sheet piles; first sliding grooves are formed in the first connecting blocks, and one ends of the steel sheet piles are slidably connected with the first sliding grooves; and second sliding grooves are formed in the second connecting blocks, and the other ends of the steel sheet piles are slidably connected with the second sliding grooves; fixing mechanisms are arranged on the first connecting blocks and the second connecting blocks, and the fixing mechanisms are connected with the steel sheet piles. The steel sheet pile cofferdam structure has the effect of improving the cofferdam dismantling efficiency.
本申请涉及一种钢板桩围堰结构,包括多个围堰单元,多个所述围堰单元依次首尾连接形成围堰,所述围堰单元包括第一连接块、第二连接块、钢板桩、第一卡块和固定机构,所述第一卡块设置在所述钢板桩的一侧,所述钢板桩的另外一侧上开设有与所述第一卡块卡接的第一卡槽;所述第一连接块上开设有第一滑槽,所述钢板桩的一端与所述第一滑槽滑移连接;所述第二连接块上开设有第二滑槽,所述钢板桩的另外一端与所述第二滑槽滑移连接;所述第一连接块与所述第二连接块上均设置有所述固定机构,所述固定机构与所述钢板桩连接。本申请具有提高围堰拆卸效率的效果。
Steel sheet pile cofferdam structure and construction method thereof
The invention relates to a steel sheet pile cofferdam structure. The steel sheet pile cofferdam structure comprises a plurality of cofferdam units, wherein the plurality of cofferdam units are sequentially connected end to end to form a cofferdam, each cofferdam unit comprises a first connecting block, a second connecting block, a steel sheet pile, a first clamping block and a fixing mechanism, the first clamping blocks are arranged on one sides of the steel sheet piles, and first clamping grooves clamped to the first clamping blocks are formed in the other sides of the steel sheet piles; first sliding grooves are formed in the first connecting blocks, and one ends of the steel sheet piles are slidably connected with the first sliding grooves; and second sliding grooves are formed in the second connecting blocks, and the other ends of the steel sheet piles are slidably connected with the second sliding grooves; fixing mechanisms are arranged on the first connecting blocks and the second connecting blocks, and the fixing mechanisms are connected with the steel sheet piles. The steel sheet pile cofferdam structure has the effect of improving the cofferdam dismantling efficiency.
本申请涉及一种钢板桩围堰结构,包括多个围堰单元,多个所述围堰单元依次首尾连接形成围堰,所述围堰单元包括第一连接块、第二连接块、钢板桩、第一卡块和固定机构,所述第一卡块设置在所述钢板桩的一侧,所述钢板桩的另外一侧上开设有与所述第一卡块卡接的第一卡槽;所述第一连接块上开设有第一滑槽,所述钢板桩的一端与所述第一滑槽滑移连接;所述第二连接块上开设有第二滑槽,所述钢板桩的另外一端与所述第二滑槽滑移连接;所述第一连接块与所述第二连接块上均设置有所述固定机构,所述固定机构与所述钢板桩连接。本申请具有提高围堰拆卸效率的效果。
Steel sheet pile cofferdam structure and construction method thereof
一种钢板桩围堰结构及其施工方法
FENG WEI (Autor:in) / WANG CHUANBO (Autor:in) / GUO RUIPENG (Autor:in) / LI QINGHUA (Autor:in) / HU SHAOHUA (Autor:in) / SHEN LEQIANG (Autor:in) / ZHANG JUNSHENG (Autor:in) / LIU CHANG (Autor:in) / HAO XIAOMING (Autor:in) / SHAN XUEMIN (Autor:in)
18.12.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Steel sheet pile cofferdam structure and construction method thereof
Europäisches Patentamt | 2023
|Steel sheet pile cofferdam and construction method thereof
Europäisches Patentamt | 2024
|Steel sheet pile cofferdam and construction method thereof
Europäisches Patentamt | 2020
|