Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Coupled steel plate shear wall convenient to install
The invention discloses a coupled steel plate shear wall convenient to install. A first base is installed on one side of a device body, first sleeves are fixed to the side face of the first base, first vertical plates are fixed to the top end of the first base, and first through holes are formed in the first vertical plates. A second base is installed on the other side of the device body, and second sleeves are fixed to the second base. One ends of connecting rods penetrate through the first sleeves, and the other ends of the connecting rods penetrate through the second sleeves. Second vertical plates are fixed to the top end of the second base, and second through holes are formed in the second vertical plates. Transverse plates are installed between the first vertical plates and the second vertical plates, and a third fixed base is installed on the side face of each transverse plate. A connecting rotating shaft is arranged on each third fixed base, and the upper ends of supporting rods are connected with the connecting rotating shafts through connecting blocks. The shear wall is good in stabilizing effect and convenient to mount.
本发明公开了一种方便安装的联肢钢板剪力墙,所述装置主体的一侧安装有第一底座,所述第一底座的侧面固定有第一套筒,所述第一底座的顶端固定有第一立板,第一立板上均设有第一贯穿孔,装置主体的另一侧安装有第二底座,所述第二底座上固定有第二套筒,连杆的一端穿过第一套筒,连杆的另一端穿过第二套筒,所述第二底座的顶端固定有第二立板,第二立板上设有第二贯穿孔,第一立板与所述第二立板之间安装有横板,横板的侧面安装有第三固定座,第三固定座上设置有连接转轴,支撑杆的上端通过连接块与连接转轴相连接,该剪力墙稳定效果好,且便于安装。
Coupled steel plate shear wall convenient to install
The invention discloses a coupled steel plate shear wall convenient to install. A first base is installed on one side of a device body, first sleeves are fixed to the side face of the first base, first vertical plates are fixed to the top end of the first base, and first through holes are formed in the first vertical plates. A second base is installed on the other side of the device body, and second sleeves are fixed to the second base. One ends of connecting rods penetrate through the first sleeves, and the other ends of the connecting rods penetrate through the second sleeves. Second vertical plates are fixed to the top end of the second base, and second through holes are formed in the second vertical plates. Transverse plates are installed between the first vertical plates and the second vertical plates, and a third fixed base is installed on the side face of each transverse plate. A connecting rotating shaft is arranged on each third fixed base, and the upper ends of supporting rods are connected with the connecting rotating shafts through connecting blocks. The shear wall is good in stabilizing effect and convenient to mount.
本发明公开了一种方便安装的联肢钢板剪力墙,所述装置主体的一侧安装有第一底座,所述第一底座的侧面固定有第一套筒,所述第一底座的顶端固定有第一立板,第一立板上均设有第一贯穿孔,装置主体的另一侧安装有第二底座,所述第二底座上固定有第二套筒,连杆的一端穿过第一套筒,连杆的另一端穿过第二套筒,所述第二底座的顶端固定有第二立板,第二立板上设有第二贯穿孔,第一立板与所述第二立板之间安装有横板,横板的侧面安装有第三固定座,第三固定座上设置有连接转轴,支撑杆的上端通过连接块与连接转轴相连接,该剪力墙稳定效果好,且便于安装。
Coupled steel plate shear wall convenient to install
一种方便安装的联肢钢板剪力墙
HAO JIPING (Autor:in) / HUANG LIUTING (Autor:in) / TIAN WEIFENG (Autor:in) / LI LU (Autor:in)
18.12.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS