Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Mounting method of prefabricated load-bearing wall
The invention discloses a mounting method of a prefabricated load-bearing wall. The mounting method of the prefabricated load-bearing wall comprises the following steps of (1) surveying and setting out, wherein side lines of the bottom face of the prefabricated load-bearing wall are popped up on an installation face where the prefabricated load-bearing wall is installed, then an X-direction control line parallel to one side line and matched with the side line in length is popped up after the prefabricated load-bearing wall moves towards the exterior of the installation face, and Y-direction control lines are popped up at the two ends of the X-direction control line; (2) leveling, wherein at least two leveling test blocks are adopted to control the flatness of the installation face, so thata grouting bin body is formed between the bottom surface of the prefabricated load-bearing wall body and the installation face; 3) hoisting and in-place mounting of the prefabricated load-bearing wall body; 4) mounting of a supporting assembly; 5) bin sealing, wherein the side surface of the grouting bin body is sealed to form bin sealing strips; and 6) grouting. All the steps are synergistic, reliable construction quality of a transition layer and an industrial floor is guaranteed, structural safety is guaranteed, and no hidden danger is left.
本发明公开了一种预制承重墙体的安装方法。该预制承重墙体的安装方法包括以下步骤:1)测量放线:在安装所述预制承重墙体的安装面上弹出预制承重墙体底面的边线,然后向安装面外部移动后弹出与一条边线平行且长度匹配的X向控制线,在所述X向控制线两端弹出Y向控制线;2)找平:采用至少两个找平试块来控制安装面的平整度,使预制承重墙体底面与安装面之间形成灌浆仓体;3)预制承重墙体吊装和安装就位;4)安装支撑组件;5)封仓:对灌浆仓体的侧面进行封堵,形成封仓条;6)灌浆。各个步骤协同作用,确保过渡层和工业化楼层施工质量可靠,保证结构安全,不留隐患。
Mounting method of prefabricated load-bearing wall
The invention discloses a mounting method of a prefabricated load-bearing wall. The mounting method of the prefabricated load-bearing wall comprises the following steps of (1) surveying and setting out, wherein side lines of the bottom face of the prefabricated load-bearing wall are popped up on an installation face where the prefabricated load-bearing wall is installed, then an X-direction control line parallel to one side line and matched with the side line in length is popped up after the prefabricated load-bearing wall moves towards the exterior of the installation face, and Y-direction control lines are popped up at the two ends of the X-direction control line; (2) leveling, wherein at least two leveling test blocks are adopted to control the flatness of the installation face, so thata grouting bin body is formed between the bottom surface of the prefabricated load-bearing wall body and the installation face; 3) hoisting and in-place mounting of the prefabricated load-bearing wall body; 4) mounting of a supporting assembly; 5) bin sealing, wherein the side surface of the grouting bin body is sealed to form bin sealing strips; and 6) grouting. All the steps are synergistic, reliable construction quality of a transition layer and an industrial floor is guaranteed, structural safety is guaranteed, and no hidden danger is left.
本发明公开了一种预制承重墙体的安装方法。该预制承重墙体的安装方法包括以下步骤:1)测量放线:在安装所述预制承重墙体的安装面上弹出预制承重墙体底面的边线,然后向安装面外部移动后弹出与一条边线平行且长度匹配的X向控制线,在所述X向控制线两端弹出Y向控制线;2)找平:采用至少两个找平试块来控制安装面的平整度,使预制承重墙体底面与安装面之间形成灌浆仓体;3)预制承重墙体吊装和安装就位;4)安装支撑组件;5)封仓:对灌浆仓体的侧面进行封堵,形成封仓条;6)灌浆。各个步骤协同作用,确保过渡层和工业化楼层施工质量可靠,保证结构安全,不留隐患。
Mounting method of prefabricated load-bearing wall
预制承重墙体的安装方法
XUE QINGWEN (Autor:in) / LIU GANG (Autor:in) / TIAN ZEHUI (Autor:in) / LIN YU (Autor:in) / WU SISHAN (Autor:in) / WANG WENJUE (Autor:in)
29.12.2020
Patent
Elektronische Ressource
Chinesisch
Prefabricated load-bearing wall body for modular building
Europäisches Patentamt | 2023
|MECHANICALLY ASSISTED PREFABRICATED WALL MOUNTING METHOD
Europäisches Patentamt | 2020
|Mounting device for prefabricated building prefabricated wall panel
Europäisches Patentamt | 2024
|