Waste coal mine transfer station reinforcing method
The invention discloses a coal mine transfer station reinforcing method which is designed for safety protection of a coal mine transfer station, and belongs to the field of coal mine facility safety.A reinforcing facility for reinforcing a coal mine transfer station is composed of column hoops, lacing bars and a reinforcing protection layer, the column hoops are arranged outside transfer stationstand columns and tightly attached to the transfer station stand columns, the transfer station stand columns are connected into a whole through the lacing bars, and the column hoops and the lacing bars are covered with the reinforcing protection layer. The method has the advantages that the transfer station stand columns are protected against invasion of corrosives in the nature for a long time, and the shape and appearance are not changed.
煤矿转运站加固方法是为煤矿转运站的安全保护而设计的,属于煤矿设施安全领域;煤矿转运站加固的加固设施由柱箍、缀条、加固保护层组成的,柱箍设置在转运站立柱的外部且紧贴转运站立柱,转运站立柱之间通过缀条连接成整体,在柱箍和缀条的外部覆盖加固保护层;本发明的有益效果是保护转运站立柱长期不受自然界腐蚀物的侵袭,形状、观感没有改变。
Waste coal mine transfer station reinforcing method
The invention discloses a coal mine transfer station reinforcing method which is designed for safety protection of a coal mine transfer station, and belongs to the field of coal mine facility safety.A reinforcing facility for reinforcing a coal mine transfer station is composed of column hoops, lacing bars and a reinforcing protection layer, the column hoops are arranged outside transfer stationstand columns and tightly attached to the transfer station stand columns, the transfer station stand columns are connected into a whole through the lacing bars, and the column hoops and the lacing bars are covered with the reinforcing protection layer. The method has the advantages that the transfer station stand columns are protected against invasion of corrosives in the nature for a long time, and the shape and appearance are not changed.
煤矿转运站加固方法是为煤矿转运站的安全保护而设计的,属于煤矿设施安全领域;煤矿转运站加固的加固设施由柱箍、缀条、加固保护层组成的,柱箍设置在转运站立柱的外部且紧贴转运站立柱,转运站立柱之间通过缀条连接成整体,在柱箍和缀条的外部覆盖加固保护层;本发明的有益效果是保护转运站立柱长期不受自然界腐蚀物的侵袭,形状、观感没有改变。
Waste coal mine transfer station reinforcing method
废旧煤矿转运站加固方法
SONG GONGYE (Autor:in)
29.12.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Electrochemical reinforcing system and reinforcing method for open pit coal mine slope
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2015
|Europäisches Patentamt | 2023
|