The invention discloses a construction method for protecting a municipal pipeline. The construction method comprises the following steps that S1, a detection groove is excavated in one end of a construction road section, the municipal pipeline is searched for, and the length direction and the height position of the municipal pipeline are determined; S2, a municipal pipeline length laying area of the construction road section is marked on the surface of the construction road section; S3, a construction channel is excavated in one side of the municipal pipeline length laying area through excavation equipment; S4, a municipal pipeline height laying area is marked on the side wall of the side, close to the municipal pipeline, in the construction channel; S5, a hollow groove is excavated belowthe municipal pipeline height laying area through the excavation equipment; S6, a loose hole is drilled above the municipal pipeline height laying area through drilling equipment; S7, a cut-off hole is drilled in the side, away from the construction channel, of the municipal pipeline length laying area through the drilling equipment; and S8, vibration equipment is used for conducting vibration operation on the municipal pipeline length laying area till the municipal pipeline is completely exposed out of the surface of the construction road section.
本发明公开了一种保护市政管线的施工方法,包括以下步骤:S1、在施工路段的一端开挖检测沟槽,寻找市政管线并确定市政管线的长度方向以及高度位置;S2、在施工路段表面标记施工路段的市政管线长度铺设区域;S3、使用开挖设备在市政管线长度铺设区域一侧挖出一条施工通道;S4、在施工通道内靠近市政管线的一侧侧壁标记出市政管道高度铺设区域;S5、使用开挖设备在市政管道高度铺设区域下方开挖陷空槽;S6、使用钻孔设备在市政管道高度铺设区域上方钻取疏松孔;S7、使用钻孔设备在市政管线长度铺设区域远离施工通道的一侧钻取截断孔;S8、使用振动设备在市政管线长度铺设区域进行振动操作,直至市政管线完全露出施工路段表面即可。
The invention discloses a construction method for protecting a municipal pipeline. The construction method comprises the following steps that S1, a detection groove is excavated in one end of a construction road section, the municipal pipeline is searched for, and the length direction and the height position of the municipal pipeline are determined; S2, a municipal pipeline length laying area of the construction road section is marked on the surface of the construction road section; S3, a construction channel is excavated in one side of the municipal pipeline length laying area through excavation equipment; S4, a municipal pipeline height laying area is marked on the side wall of the side, close to the municipal pipeline, in the construction channel; S5, a hollow groove is excavated belowthe municipal pipeline height laying area through the excavation equipment; S6, a loose hole is drilled above the municipal pipeline height laying area through drilling equipment; S7, a cut-off hole is drilled in the side, away from the construction channel, of the municipal pipeline length laying area through the drilling equipment; and S8, vibration equipment is used for conducting vibration operation on the municipal pipeline length laying area till the municipal pipeline is completely exposed out of the surface of the construction road section.
本发明公开了一种保护市政管线的施工方法,包括以下步骤:S1、在施工路段的一端开挖检测沟槽,寻找市政管线并确定市政管线的长度方向以及高度位置;S2、在施工路段表面标记施工路段的市政管线长度铺设区域;S3、使用开挖设备在市政管线长度铺设区域一侧挖出一条施工通道;S4、在施工通道内靠近市政管线的一侧侧壁标记出市政管道高度铺设区域;S5、使用开挖设备在市政管道高度铺设区域下方开挖陷空槽;S6、使用钻孔设备在市政管道高度铺设区域上方钻取疏松孔;S7、使用钻孔设备在市政管线长度铺设区域远离施工通道的一侧钻取截断孔;S8、使用振动设备在市政管线长度铺设区域进行振动操作,直至市政管线完全露出施工路段表面即可。
Construction method for protecting municipal pipeline
一种保护市政管线的施工方法
05.01.2021
Patent
Elektronische Ressource
Chinesisch
Municipal road pipeline reinforcing protecting system and construction method thereof
Europäisches Patentamt | 2020
|Construction method for protecting municipal pipelines
Europäisches Patentamt | 2021
|