Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Intelligent building system integrated steel structure
The invention relates to the field of building steel structures, in particular to an intelligent building system integrated steel structure. The intelligent building system integrated steel structurecomprises a hoarding, a top plate is fixedly installed at the upper end of the hoarding, a flow guide plate is fixedly installed on the lower end face of the top plate, the section of the flow guide plate is in an inferior arc shape, and cambered plates extend out of the two ends of the flow guide plate; the cambered plates and the outer surface of the flow guide plate are connected in smooth andinclined modes, the cambered plates are fixedly connected with the lower end face of the top plate, and a plurality of sets of flow guide pieces are arranged on the position, close to the peripheriesof the cambered plates and the periphery of the flow guide plate, of the lower end face of the top plate; and the flow guide pieces comprise shifting sheets, inserting rods extending upwards from theedges of one sides of the shifting sheets, and limiting balls fixedly connected to the upper ends of the inserting rods, and the limiting balls and the inserting rods are movably inserted into the lower end face of the top plate. According to the intelligent building system integrated steel structure, flowing and dissipating of hot air on the inner side of a building are facilitated, and energy consumption is avoided in the process.
本发明涉及建筑钢结构领域,尤其涉及一种智能建筑系统集成的钢结构,包括围板,所述围板的上端固定安装有顶板,所述顶板的下端面固定安装有导流板,所述导流板的截面呈劣弧形状,所述导流板的两端延伸出弧面板,所述弧面板与导流板的外表面平滑斜街,且所述弧面板与顶板的下端面之间固定连接,所述顶板的下端面靠近弧面板与导流板的四周围设有若干组的导流件,所述导流件包括拨片、从拨片一侧边沿朝向上方延伸的插入杆、固定连接在插入杆上端的限位球,所述限位球与插入杆活动插入顶板的下端面,本发明有利于建筑内侧热空气的流动与散出,且此过程无能耗。
Intelligent building system integrated steel structure
The invention relates to the field of building steel structures, in particular to an intelligent building system integrated steel structure. The intelligent building system integrated steel structurecomprises a hoarding, a top plate is fixedly installed at the upper end of the hoarding, a flow guide plate is fixedly installed on the lower end face of the top plate, the section of the flow guide plate is in an inferior arc shape, and cambered plates extend out of the two ends of the flow guide plate; the cambered plates and the outer surface of the flow guide plate are connected in smooth andinclined modes, the cambered plates are fixedly connected with the lower end face of the top plate, and a plurality of sets of flow guide pieces are arranged on the position, close to the peripheriesof the cambered plates and the periphery of the flow guide plate, of the lower end face of the top plate; and the flow guide pieces comprise shifting sheets, inserting rods extending upwards from theedges of one sides of the shifting sheets, and limiting balls fixedly connected to the upper ends of the inserting rods, and the limiting balls and the inserting rods are movably inserted into the lower end face of the top plate. According to the intelligent building system integrated steel structure, flowing and dissipating of hot air on the inner side of a building are facilitated, and energy consumption is avoided in the process.
本发明涉及建筑钢结构领域,尤其涉及一种智能建筑系统集成的钢结构,包括围板,所述围板的上端固定安装有顶板,所述顶板的下端面固定安装有导流板,所述导流板的截面呈劣弧形状,所述导流板的两端延伸出弧面板,所述弧面板与导流板的外表面平滑斜街,且所述弧面板与顶板的下端面之间固定连接,所述顶板的下端面靠近弧面板与导流板的四周围设有若干组的导流件,所述导流件包括拨片、从拨片一侧边沿朝向上方延伸的插入杆、固定连接在插入杆上端的限位球,所述限位球与插入杆活动插入顶板的下端面,本发明有利于建筑内侧热空气的流动与散出,且此过程无能耗。
Intelligent building system integrated steel structure
一种智能建筑系统集成的钢结构
05.01.2021
Patent
Elektronische Ressource
Chinesisch
Fabricated steel structure building integrated system
Europäisches Patentamt | 2022
|ENVIRONMENT-FRIENDLY INTELLIGENT INTEGRATED BUILDING STRUCTURE
Europäisches Patentamt | 2020
|