Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction process of heat-preservation anti-freezing partition wall
The invention relates to a construction process of a heat-preservation anti-freezing partition wall. The construction process comprises the following construction preparation steps of preparing ardealite powder, cleaning up a construction site, mounting a partition wall base body on the construction site, preparing mixed filler, mounting a spraying formwork on the side surface of the partition wall base body, and coating all reserved parts in the construction site with plastic films, wherein during spraying construction, construction operation is conducted on the basis of a construction drawing according to a preset spraying path and a preset spraying process. By adopting the technical scheme, the manufactured partition wall has the effects of environmental protection, heat insulation, frost resistance and the like, the structural strength of the partition wall is improved through a light steel keel frame in the partition wall base body, the frost resistance function of the partition wall is enhanced through industrial salt, the reasonable construction process and the reasonable spraying path are adopted during construction, the reserved parts in the partition wall are reasonably treated, faults of construction process equipment are avoided, the construction efficiency is improved, the thickness of a spraying layer is reasonably controlled, the thickness of the spraying layer is more uniform, and the construction quality is improved.
本发明涉及一种保温抗冻隔墙施工工艺,包括制备磷石膏粉、清理施工现场、在施工现场安装隔墙基体、制备混合填料、在隔墙基体侧面上安装喷筑模板以及使用塑料薄膜包覆施工现场内的所有预留件的施工准备步骤,在喷涂施工中,根据施工图纸按照预定的喷涂路径和喷涂工艺进行施工作业的步骤;采用本发明的技术方案,所制得的隔墙具有绿色环保、隔热保温、抗冻等功效,隔墙基体内的轻钢龙骨架增加了隔墙的结构强度,工业盐增强了隔墙抗冻功能,施工过程采用了合理的施工工艺和喷涂路径,合理地处理了隔墙内的预留件,避免了施工工艺装备出现故障,提高了施工效率,合理地控制了喷涂层厚度,使喷涂层的厚度更加均匀,提高了施工质量。
Construction process of heat-preservation anti-freezing partition wall
The invention relates to a construction process of a heat-preservation anti-freezing partition wall. The construction process comprises the following construction preparation steps of preparing ardealite powder, cleaning up a construction site, mounting a partition wall base body on the construction site, preparing mixed filler, mounting a spraying formwork on the side surface of the partition wall base body, and coating all reserved parts in the construction site with plastic films, wherein during spraying construction, construction operation is conducted on the basis of a construction drawing according to a preset spraying path and a preset spraying process. By adopting the technical scheme, the manufactured partition wall has the effects of environmental protection, heat insulation, frost resistance and the like, the structural strength of the partition wall is improved through a light steel keel frame in the partition wall base body, the frost resistance function of the partition wall is enhanced through industrial salt, the reasonable construction process and the reasonable spraying path are adopted during construction, the reserved parts in the partition wall are reasonably treated, faults of construction process equipment are avoided, the construction efficiency is improved, the thickness of a spraying layer is reasonably controlled, the thickness of the spraying layer is more uniform, and the construction quality is improved.
本发明涉及一种保温抗冻隔墙施工工艺,包括制备磷石膏粉、清理施工现场、在施工现场安装隔墙基体、制备混合填料、在隔墙基体侧面上安装喷筑模板以及使用塑料薄膜包覆施工现场内的所有预留件的施工准备步骤,在喷涂施工中,根据施工图纸按照预定的喷涂路径和喷涂工艺进行施工作业的步骤;采用本发明的技术方案,所制得的隔墙具有绿色环保、隔热保温、抗冻等功效,隔墙基体内的轻钢龙骨架增加了隔墙的结构强度,工业盐增强了隔墙抗冻功能,施工过程采用了合理的施工工艺和喷涂路径,合理地处理了隔墙内的预留件,避免了施工工艺装备出现故障,提高了施工效率,合理地控制了喷涂层厚度,使喷涂层的厚度更加均匀,提高了施工质量。
Construction process of heat-preservation anti-freezing partition wall
一种保温抗冻隔墙施工工艺
JIANG KUN (Autor:in) / LIU XUAN (Autor:in) / WAN TINGRONG (Autor:in) / ZHANG SIBIN (Autor:in) / QIN HE (Autor:in) / GAN HENG (Autor:in) / LU HUA (Autor:in) / YUAN XIAO (Autor:in) / ZHOU YUTING (Autor:in) / SHI ZHENGYANG (Autor:in)
08.01.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
C04B
Kalk
,
LIME
/
C09D
Überzugsmittel, z.B. Anstrichstoffe, Firnisse oder Lacke
,
COATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS
/
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Heat-preservation anti-freezing road and construction method thereof
Europäisches Patentamt | 2020
|Partition wall construction process and partition wall structure
Europäisches Patentamt | 2021
|Heat preservation wall and construction method of heat preservation wall
Europäisches Patentamt | 2021
|Anti-cracking heat preservation wall and construction method thereof
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|