Non-traditional secondary construction method for toilet water stop sill
The invention discloses a non-traditional secondary construction method for a toilet water stop sill. The method sequentially comprises the steps of 1, floor formwork installation; 2, toilet beam andplate steel bar binding; 3, galvanized water stop steel plate installation; 4, floor concrete pouring; 5, concrete curing; 6, toilet water stop sill position shaving; 7, secondary positioning and paying-off; 8, toilet water stop sill hanging formwork installation; 9, hanging formwork calibration and acceptance; 10, water stop sill concrete pouring; and 11, secondary concrete curing. According to the method, the common quality problems that toilet water stop sill hanging formwork primary pouring is prone to deviation, slurry leakage, pitted surfaces and the like can be avoided, meanwhile, the quality defects that leakage points, seepage points and the like are prone to occurring in conventional toilet water stop sill secondary pouring can be avoided, and the method has high progressivenessand practicability.
本发明公开了一种卫生间止水坎非传统二次施工方法,工法步骤依次为:第一步:楼层模板安装;第二步:卫生间梁、板钢筋绑扎,第三步:镀锌止水钢板安装,第四步:楼层混凝土浇筑,第五步:混凝土养护,第六步:卫生间止水坎位置剃毛,第七步:二次定位放线,第八步:卫生间止水坎吊模安装,第九步:吊模校准验收,第十步:止水坎混凝土浇筑,第十一步:二次混凝土养护。本发明可以避免卫生间止水坎吊模一次浇筑易偏位、漏浆、麻面等质量通病,同时可以避免常规卫生间止水坎二次浇筑易出现漏点、渗点等质量缺陷具有较高的进步性和实用性。
Non-traditional secondary construction method for toilet water stop sill
The invention discloses a non-traditional secondary construction method for a toilet water stop sill. The method sequentially comprises the steps of 1, floor formwork installation; 2, toilet beam andplate steel bar binding; 3, galvanized water stop steel plate installation; 4, floor concrete pouring; 5, concrete curing; 6, toilet water stop sill position shaving; 7, secondary positioning and paying-off; 8, toilet water stop sill hanging formwork installation; 9, hanging formwork calibration and acceptance; 10, water stop sill concrete pouring; and 11, secondary concrete curing. According to the method, the common quality problems that toilet water stop sill hanging formwork primary pouring is prone to deviation, slurry leakage, pitted surfaces and the like can be avoided, meanwhile, the quality defects that leakage points, seepage points and the like are prone to occurring in conventional toilet water stop sill secondary pouring can be avoided, and the method has high progressivenessand practicability.
本发明公开了一种卫生间止水坎非传统二次施工方法,工法步骤依次为:第一步:楼层模板安装;第二步:卫生间梁、板钢筋绑扎,第三步:镀锌止水钢板安装,第四步:楼层混凝土浇筑,第五步:混凝土养护,第六步:卫生间止水坎位置剃毛,第七步:二次定位放线,第八步:卫生间止水坎吊模安装,第九步:吊模校准验收,第十步:止水坎混凝土浇筑,第十一步:二次混凝土养护。本发明可以避免卫生间止水坎吊模一次浇筑易偏位、漏浆、麻面等质量通病,同时可以避免常规卫生间止水坎二次浇筑易出现漏点、渗点等质量缺陷具有较高的进步性和实用性。
Non-traditional secondary construction method for toilet water stop sill
一种卫生间止水坎非传统二次施工方法
WANG GUANGFU (Autor:in) / WAN SHENGQUAN (Autor:in) / ZHANG YOUSHENG (Autor:in) / ZHAO LEI (Autor:in) / LI BIN (Autor:in)
08.01.2021
Patent
Elektronische Ressource
Chinesisch
Toilet reverse sill pre-buried water stop construction method
Europäisches Patentamt | 2020
|Water stop sill table template device and construction method
Europäisches Patentamt | 2020
|Mold for flue water stop sill and construction method thereof
Europäisches Patentamt | 2022
|