Construction method of graded anti-blocking low-pressure pipeline system for hydrovoltaic generators
The invention provides a construction method of a graded anti-blocking low-pressure pipeline system for hydrovoltaic generators. The construction method comprises the following steps of dividing an area from a top water storage area to a bottommost water outlet into a plurality of power generating units, and respectively arranging a top water storage area, a hydrovoltaic generator, a low-pressurearea, a necking water channel, an anti-blocking pipeline and a waterproof fixed layer in each power generating unit so as to obtain the graded anti-blocking low-pressure pipeline system for the hydrovoltaic generators. According to the graded anti-blocking low-pressure pipeline system constructed by adopting the method, the gravitational potential energy of water can be used in a multistage mode so as to form multistage output of electric energy; the low-pressure area is formed by utilizing the difference of the water flow speed, so that the power generating efficiency is improved; and a series of problems caused by the blockage of a certain hydrovoltaic generator are avoided.
本发明提供一种水伏发电机用分级防塞低压管道系统构筑方法,将顶端贮水区到最底部出水口的区域划分为多个发电单元,在每个发电单元中分别设置顶部贮水区、水伏发电机、低压区、缩口水道、防塞管道与防水固定层,获得水伏发电机用分级防塞低压管道系统。本发明所构筑的分级防塞低压管道系统能够多级次利用水的重力势能,形成电能的多级输出;利用水流速度的差异形成低压区提升发电效率;避免某一水伏发电机发生堵塞产生的一系列问题。
Construction method of graded anti-blocking low-pressure pipeline system for hydrovoltaic generators
The invention provides a construction method of a graded anti-blocking low-pressure pipeline system for hydrovoltaic generators. The construction method comprises the following steps of dividing an area from a top water storage area to a bottommost water outlet into a plurality of power generating units, and respectively arranging a top water storage area, a hydrovoltaic generator, a low-pressurearea, a necking water channel, an anti-blocking pipeline and a waterproof fixed layer in each power generating unit so as to obtain the graded anti-blocking low-pressure pipeline system for the hydrovoltaic generators. According to the graded anti-blocking low-pressure pipeline system constructed by adopting the method, the gravitational potential energy of water can be used in a multistage mode so as to form multistage output of electric energy; the low-pressure area is formed by utilizing the difference of the water flow speed, so that the power generating efficiency is improved; and a series of problems caused by the blockage of a certain hydrovoltaic generator are avoided.
本发明提供一种水伏发电机用分级防塞低压管道系统构筑方法,将顶端贮水区到最底部出水口的区域划分为多个发电单元,在每个发电单元中分别设置顶部贮水区、水伏发电机、低压区、缩口水道、防塞管道与防水固定层,获得水伏发电机用分级防塞低压管道系统。本发明所构筑的分级防塞低压管道系统能够多级次利用水的重力势能,形成电能的多级输出;利用水流速度的差异形成低压区提升发电效率;避免某一水伏发电机发生堵塞产生的一系列问题。
Construction method of graded anti-blocking low-pressure pipeline system for hydrovoltaic generators
一种水伏发电机用分级防塞低压管道系统构筑方法
MIAO ZHONGZHENG (Autor:in)
15.01.2021
Patent
Elektronische Ressource
Chinesisch
Municipal construction pipeline with anti-blocking function
Europäisches Patentamt | 2021
|Anti-blocking blow-off pipeline for building construction
Europäisches Patentamt | 2024
|Pipeline anti-blocking equipment for drainage pipe construction
Europäisches Patentamt | 2024
|