Building structure rapid synchronous lifting device and construction method
The invention discloses a building structure rapid synchronous lifting device and a construction method. The device comprises at least two trusses of lifting assemblies; each truss of lifting assemblies comprises a lifting base, a lifting support, a lifting cross beam, a center hole jack and a lifting hanging rod; the lifting bases are located below a holding column bearing platform at the bottomof a to-be-lifted structure; the lifting supports are fixedly installed on the lifting bases; the lifting cross beams are fixedly mounted at the top ends of the lifting supports; the center hole jacksare mounted on the lifting cross beams; and the lifting hanging rods penetrate through the center hole jacks, the lifting cross beams and the holding column bearing platform and tie the bottom of theholding column bearing platform, tension is applied to the lifting hanging rods through the center hole jacks, and the holding column bearing platform and the structure are synchronously lifted. Cushion blocks do not need to be additionally arranged and the positions of the jacks do not need to be reset in the whole lifting construction process, lifting construction is safer and faster, operationis easy, the manufacturing cost is low, and the lifting device can be detached and repeatedly used and has excellent practical value.
本发明公开了一种建筑物结构快速同步抬升装置及施工方法,该装置包括至少两榀抬升组件;每榀抬升组件均包括抬升底座,抬升支架、抬升横梁、穿心式千斤顶和抬升吊杆;所述抬升底座位于待抬升结构底部的抱柱承台下方;所述抬升支架固定安装在抬升底座上;所述抬升横梁固定安装在抬升支架的顶端;所述穿心式千斤顶安装在抬升横梁之上;所述抬升吊杆穿过穿心式千斤顶、抬升横梁及抱柱承台,并拴住抱柱承台底部,通过穿心式千斤顶对抬升吊杆施加拉力,同步抬升抱柱承台和结构。整个抬升施工过程不需要增设垫块和重置千斤顶位置,抬升施工更安全、快捷、易于操作、且造价低,并可拆分重复使用,具极好的实用价值。
Building structure rapid synchronous lifting device and construction method
The invention discloses a building structure rapid synchronous lifting device and a construction method. The device comprises at least two trusses of lifting assemblies; each truss of lifting assemblies comprises a lifting base, a lifting support, a lifting cross beam, a center hole jack and a lifting hanging rod; the lifting bases are located below a holding column bearing platform at the bottomof a to-be-lifted structure; the lifting supports are fixedly installed on the lifting bases; the lifting cross beams are fixedly mounted at the top ends of the lifting supports; the center hole jacksare mounted on the lifting cross beams; and the lifting hanging rods penetrate through the center hole jacks, the lifting cross beams and the holding column bearing platform and tie the bottom of theholding column bearing platform, tension is applied to the lifting hanging rods through the center hole jacks, and the holding column bearing platform and the structure are synchronously lifted. Cushion blocks do not need to be additionally arranged and the positions of the jacks do not need to be reset in the whole lifting construction process, lifting construction is safer and faster, operationis easy, the manufacturing cost is low, and the lifting device can be detached and repeatedly used and has excellent practical value.
本发明公开了一种建筑物结构快速同步抬升装置及施工方法,该装置包括至少两榀抬升组件;每榀抬升组件均包括抬升底座,抬升支架、抬升横梁、穿心式千斤顶和抬升吊杆;所述抬升底座位于待抬升结构底部的抱柱承台下方;所述抬升支架固定安装在抬升底座上;所述抬升横梁固定安装在抬升支架的顶端;所述穿心式千斤顶安装在抬升横梁之上;所述抬升吊杆穿过穿心式千斤顶、抬升横梁及抱柱承台,并拴住抱柱承台底部,通过穿心式千斤顶对抬升吊杆施加拉力,同步抬升抱柱承台和结构。整个抬升施工过程不需要增设垫块和重置千斤顶位置,抬升施工更安全、快捷、易于操作、且造价低,并可拆分重复使用,具极好的实用价值。
Building structure rapid synchronous lifting device and construction method
一种建筑物结构快速同步抬升装置及施工方法
LI JINBAO (Autor:in) / LI XINTONG (Autor:in) / LI BIQING (Autor:in) / JIANG TAO (Autor:in) / LI LONGQING (Autor:in) / GUO YINGQING (Autor:in) / CHUN QING (Autor:in) / DAI LI (Autor:in)
02.02.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Synchronous lifting structure for construction machinery and building construction
Europäisches Patentamt | 2020
|Synchronous lifting structure for construction machine and construction
Europäisches Patentamt | 2020
|