Construction method for accurately mounting annular foundation reinforcement cage of rotary hearth furnace
The invention relates to a construction method for accurately mounting an annular foundation reinforcement cage of a rotary hearth furnace. The construction method comprises the steps that 1, construction preparation is conducted; 2, main reinforcements and stirrups of the reinforcement cage are manufactured; 3, a steel bar spacing control caliper is manufactured; 4, a steel bar supporting frame is erected and positioning is conducted; 5, the spacing control caliper is fixed on the supporting frame; 6, steel bars are hoisted and placed on the supporting frame to be bound and mounted; 7, the distance and the protection layer thickness are checked; 8, the supporting frame is dismounted; 9, the position, the distance and the protection layer thickness are rechecked; and 10, construction of the next procedure is conducted. The construction method is safe and reliable, the reinforcement cage is made of universal steel on a construction site, the structure is simple, manufacturing is convenient, and good popularization value is achieved.
本发明涉及一种转底炉环形基础钢筋骨架精确安装的施工方法,包括步骤1、施工准备;2、钢筋骨架主筋、箍筋制作;3、钢筋间距控制卡尺制作;4、搭设钢筋支撑架并定位;5、间距控制卡尺固定在支撑架上;6、钢筋吊装放置在支撑架上进行绑扎、安装;7、间距及保护成厚度检查;8、拆除支撑架;9、位置、间距及保护成厚度复查;10、进行下一道工序施工。本发明安全可靠,而且采用施工现场通用钢材制作,结构简单,制作方便具有很好的推广价值。
Construction method for accurately mounting annular foundation reinforcement cage of rotary hearth furnace
The invention relates to a construction method for accurately mounting an annular foundation reinforcement cage of a rotary hearth furnace. The construction method comprises the steps that 1, construction preparation is conducted; 2, main reinforcements and stirrups of the reinforcement cage are manufactured; 3, a steel bar spacing control caliper is manufactured; 4, a steel bar supporting frame is erected and positioning is conducted; 5, the spacing control caliper is fixed on the supporting frame; 6, steel bars are hoisted and placed on the supporting frame to be bound and mounted; 7, the distance and the protection layer thickness are checked; 8, the supporting frame is dismounted; 9, the position, the distance and the protection layer thickness are rechecked; and 10, construction of the next procedure is conducted. The construction method is safe and reliable, the reinforcement cage is made of universal steel on a construction site, the structure is simple, manufacturing is convenient, and good popularization value is achieved.
本发明涉及一种转底炉环形基础钢筋骨架精确安装的施工方法,包括步骤1、施工准备;2、钢筋骨架主筋、箍筋制作;3、钢筋间距控制卡尺制作;4、搭设钢筋支撑架并定位;5、间距控制卡尺固定在支撑架上;6、钢筋吊装放置在支撑架上进行绑扎、安装;7、间距及保护成厚度检查;8、拆除支撑架;9、位置、间距及保护成厚度复查;10、进行下一道工序施工。本发明安全可靠,而且采用施工现场通用钢材制作,结构简单,制作方便具有很好的推广价值。
Construction method for accurately mounting annular foundation reinforcement cage of rotary hearth furnace
转底炉环形基础钢筋骨架精确安装的施工方法
WANG XINXIN (Autor:in) / GUO PAN (Autor:in) / WANG YUANYUAN (Autor:in) / LAN ZHENGLIN (Autor:in) / ZHANG JIE (Autor:in)
05.02.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Mounting device for pile foundation reinforcement cage
Europäisches Patentamt | 2023
|Reinforcement cage mounting device and reinforcement cage mounting method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|