Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction equipment for bridge cast-in-place piles in frozen earth area
The invention belongs to the technical field of bridge construction, and particularly relates to construction equipment for bridge cast-in-place piles in a frozen earth area. The construction equipment comprises a drilling machine body, a machine frame is mounted on one side of the drilling machine body, a driving motor is mounted on one side of the upper end of the machine frame, and a mounting shell is arranged on the periphery of the outer part of the machine frame. A protective shell is arranged on the periphery of the outer part of the driving motor, a fixing rod is fixedly connected to the outer wall of one side of the upper end of the machine frame, a first clamping plate and a second clamping plate are correspondingly and integrally formed on the two sides of the bottom end of themounting shell, the second clamping plate is attached to the fixing rod, and fixing cylinders are fixedly connected to the outer walls of the two sides of the bottom end of the machine frame. One sides of the fixing cylinders are in screw connection with limiting bolts, and the interiors of the fixing cylinders are connected with first supporting rods in a penetrating and closing mode. According to the construction equipment for the bridge cast-in-place piles in the frozen earth area, external protection of the driving motor and stable supporting and fixing of the machine frame are facilitated, so that the drilling machine body is convenient to use, and then bridge cast-in-place pile construction in the frozen earth area is facilitated.
本发明属于桥梁施工技术领域,尤其为一种冻土地区的桥梁灌注桩用施工设备,包括钻机本体,所述钻机本体的一侧安装有机架,所述机架的上端一侧安装有驱动电机,所述机架的外部四周设置有安装壳,所述驱动电机的外部四周设置有防护壳,所述机架的上端一侧外壁固定连接有固定杆,所述安装壳的底端两侧分别一体成型有一号卡板和二号卡板,所述二号卡板与固定杆相互贴合,所述机架的底端两侧外壁均固定连接有固定筒,所述固定筒,所述固定筒的一侧旋合连接有限位螺栓,所述固定筒的内部穿合连接有一号支杆,通过上述结构便于驱动电机的外部防护以及机架的稳定支撑和固定,从而便于钻机本体的使用,进而便于冻土地区的桥梁灌注桩施工。
Construction equipment for bridge cast-in-place piles in frozen earth area
The invention belongs to the technical field of bridge construction, and particularly relates to construction equipment for bridge cast-in-place piles in a frozen earth area. The construction equipment comprises a drilling machine body, a machine frame is mounted on one side of the drilling machine body, a driving motor is mounted on one side of the upper end of the machine frame, and a mounting shell is arranged on the periphery of the outer part of the machine frame. A protective shell is arranged on the periphery of the outer part of the driving motor, a fixing rod is fixedly connected to the outer wall of one side of the upper end of the machine frame, a first clamping plate and a second clamping plate are correspondingly and integrally formed on the two sides of the bottom end of themounting shell, the second clamping plate is attached to the fixing rod, and fixing cylinders are fixedly connected to the outer walls of the two sides of the bottom end of the machine frame. One sides of the fixing cylinders are in screw connection with limiting bolts, and the interiors of the fixing cylinders are connected with first supporting rods in a penetrating and closing mode. According to the construction equipment for the bridge cast-in-place piles in the frozen earth area, external protection of the driving motor and stable supporting and fixing of the machine frame are facilitated, so that the drilling machine body is convenient to use, and then bridge cast-in-place pile construction in the frozen earth area is facilitated.
本发明属于桥梁施工技术领域,尤其为一种冻土地区的桥梁灌注桩用施工设备,包括钻机本体,所述钻机本体的一侧安装有机架,所述机架的上端一侧安装有驱动电机,所述机架的外部四周设置有安装壳,所述驱动电机的外部四周设置有防护壳,所述机架的上端一侧外壁固定连接有固定杆,所述安装壳的底端两侧分别一体成型有一号卡板和二号卡板,所述二号卡板与固定杆相互贴合,所述机架的底端两侧外壁均固定连接有固定筒,所述固定筒,所述固定筒的一侧旋合连接有限位螺栓,所述固定筒的内部穿合连接有一号支杆,通过上述结构便于驱动电机的外部防护以及机架的稳定支撑和固定,从而便于钻机本体的使用,进而便于冻土地区的桥梁灌注桩施工。
Construction equipment for bridge cast-in-place piles in frozen earth area
一种冻土地区的桥梁灌注桩用施工设备
YANG HONGFU (Autor:in) / WANG QINGZHI (Autor:in) / JIA FUGUI (Autor:in) / YE SHENGCHUN (Autor:in) / XUE ZHAOFENG (Autor:in) / MA LIANG (Autor:in) / YANG YOUGEN (Autor:in) / LI RUILIN (Autor:in) / LIU LEI (Autor:in) / CHENG WENDONG (Autor:in)
05.02.2021
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Online Contents | 1983
|WALL STRUCTURE CONSTRUCTION METHOD USING CAST IN PLACE PILES
Europäisches Patentamt | 2023
|Engineering Index Backfile | 1935
|Construction and Analysis of Cast-in-Place Tubular Piles
ASCE | 2012
|