Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Slope micropile reinforced drainage system after sliding of fill slope and construction method thereof
The invention relates to a slope micropile reinforced drainage system after sliding of a fill slope. The slope micropile reinforced drainage system comprises the fill slope and a drainage ditch, wherein the drainage ditch is located in the side of the slope toe of the fill slope, a plurality of micropile groups are longitudinally arranged in the fill slope at intervals from the slope toe to the slope top, a plurality of slope toe soft permeable pipes which extend into the drainage ditch from the interior of a slope body are arranged in the slope toe position of the fill slope, a plurality of slope surface soft permeable pipes which extend out of the slope surface from the interior of the slope body are arranged in the slope body of the fill slope, and a pile top crown beam is further arranged on the tops of the micropile groups which are located in the slope toe position. The slope micropile reinforced drainage system has the advantages of reasonable design, the simple structure, convenience in construction, safety and reliability, and an overall stable slope body is formed, so that the sliding side slope is reinforced; and additionally, the slope body and a slope toe drainage system are easy to repair and reform, and comprehensive advantages are obvious.
本发明涉及一种填方边坡滑动后的坡体微型桩加固排水系统,包括填方边坡以及位于填方边坡坡脚侧部的排水沟,所述填方边坡内部沿坡脚至坡顶纵向间隔设有多个微型桩组,所以填方边坡的坡脚位置设置有多个由坡体内部延伸至排水沟内的坡脚软式透水管,所述填方边坡的坡体内部设置有多个由坡体内延伸出坡面的坡面软式透水管,位于坡脚位置的微型桩组顶部还设置有桩顶冠梁。本装置设计合理,结构简单,施工方便且安全可靠,形成整体稳定的坡体,从而对已滑动的边坡进行加固;同时易于坡体、坡脚排水系统的修复改造,综合优势明显。
Slope micropile reinforced drainage system after sliding of fill slope and construction method thereof
The invention relates to a slope micropile reinforced drainage system after sliding of a fill slope. The slope micropile reinforced drainage system comprises the fill slope and a drainage ditch, wherein the drainage ditch is located in the side of the slope toe of the fill slope, a plurality of micropile groups are longitudinally arranged in the fill slope at intervals from the slope toe to the slope top, a plurality of slope toe soft permeable pipes which extend into the drainage ditch from the interior of a slope body are arranged in the slope toe position of the fill slope, a plurality of slope surface soft permeable pipes which extend out of the slope surface from the interior of the slope body are arranged in the slope body of the fill slope, and a pile top crown beam is further arranged on the tops of the micropile groups which are located in the slope toe position. The slope micropile reinforced drainage system has the advantages of reasonable design, the simple structure, convenience in construction, safety and reliability, and an overall stable slope body is formed, so that the sliding side slope is reinforced; and additionally, the slope body and a slope toe drainage system are easy to repair and reform, and comprehensive advantages are obvious.
本发明涉及一种填方边坡滑动后的坡体微型桩加固排水系统,包括填方边坡以及位于填方边坡坡脚侧部的排水沟,所述填方边坡内部沿坡脚至坡顶纵向间隔设有多个微型桩组,所以填方边坡的坡脚位置设置有多个由坡体内部延伸至排水沟内的坡脚软式透水管,所述填方边坡的坡体内部设置有多个由坡体内延伸出坡面的坡面软式透水管,位于坡脚位置的微型桩组顶部还设置有桩顶冠梁。本装置设计合理,结构简单,施工方便且安全可靠,形成整体稳定的坡体,从而对已滑动的边坡进行加固;同时易于坡体、坡脚排水系统的修复改造,综合优势明显。
Slope micropile reinforced drainage system after sliding of fill slope and construction method thereof
填方边坡滑动后的坡体微型桩加固排水系统及其施工方法
HUANG MINGXIANG (Autor:in) / ZHANG JIANXUN (Autor:in) / CHEN XIAOXIANG (Autor:in) / BIAN HONGZHI (Autor:in) / WANG WANJUN (Autor:in)
09.02.2021
Patent
Elektronische Ressource
Chinesisch
Slope stabilization by micropile reinforcement
British Library Conference Proceedings | 1996
|High fill slope drainage structure and construction method thereof
Europäisches Patentamt | 2021
|Stability Analysis of Accumulative Formation Slope Reinforced by Inclined Micropile Group
DOAJ | 2020
|Analysis of Slope Failure Mechanisms Considering Micropile-Soil Interaction
Trans Tech Publications | 2013
|