Fabricated curtain wall overall lifting installation construction method based on BIM model construction technical support
The invention provides a fabricated curtain wall overall lifting installation construction method based on BIM model construction technical support. The method comprises the steps: carrying out the grid division of a vertical surface of a building curtain wall through the Rhino software technology and three-dimensional setting-out; using MATHCAD calculation modeling software for constructing a structural stress analysis model of a whole single-truss assembled curtain wall aluminum plate steel truss; processing and assembling a single assembled curtain wall truss keel in a production place; re-checking the position where the assembled curtain wall is to be installed, and integrally hoisting the single assembled curtain wall after the re-checking is errorless; integrally lifting and mountingthe assembled curtain wall; and then cleaning gaps between the plates, injecting silicone weather-proof sealant, and finally completing construction of the integrally-assembled curtain wall, and delivering the integrally-assembled curtain wall to be checked and accepted. The construction method is mainly suitable for building curtain wall places with ultra-high, ultra-difficult, large span and short construction period.
本发明提供一种基于BIM模型构建技术支撑的装配式幕墙整体提升安装施工方法,利用Rhino软件技术及三维放线,对建筑幕墙立面进行分格划分;使用MATHCAD计算建模软件构建整体单榀装配式幕墙铝板钢桁架的结构受力分析模型;在生产场所加工组装单榀装配式幕墙桁架龙骨;对拟安装装配式幕墙的位置进行复核,复核无误后进行单榀装配式幕墙整体吊装;采用装配式幕墙整体提升安装;然后清洁板材间缝隙,打注硅酮耐候密封胶,最终完成整体装配式幕墙的施工,交付验收使用。施工方法适用于主要适用于超高、超难、大跨度及其施工周期短的建筑幕墙场所。
Fabricated curtain wall overall lifting installation construction method based on BIM model construction technical support
The invention provides a fabricated curtain wall overall lifting installation construction method based on BIM model construction technical support. The method comprises the steps: carrying out the grid division of a vertical surface of a building curtain wall through the Rhino software technology and three-dimensional setting-out; using MATHCAD calculation modeling software for constructing a structural stress analysis model of a whole single-truss assembled curtain wall aluminum plate steel truss; processing and assembling a single assembled curtain wall truss keel in a production place; re-checking the position where the assembled curtain wall is to be installed, and integrally hoisting the single assembled curtain wall after the re-checking is errorless; integrally lifting and mountingthe assembled curtain wall; and then cleaning gaps between the plates, injecting silicone weather-proof sealant, and finally completing construction of the integrally-assembled curtain wall, and delivering the integrally-assembled curtain wall to be checked and accepted. The construction method is mainly suitable for building curtain wall places with ultra-high, ultra-difficult, large span and short construction period.
本发明提供一种基于BIM模型构建技术支撑的装配式幕墙整体提升安装施工方法,利用Rhino软件技术及三维放线,对建筑幕墙立面进行分格划分;使用MATHCAD计算建模软件构建整体单榀装配式幕墙铝板钢桁架的结构受力分析模型;在生产场所加工组装单榀装配式幕墙桁架龙骨;对拟安装装配式幕墙的位置进行复核,复核无误后进行单榀装配式幕墙整体吊装;采用装配式幕墙整体提升安装;然后清洁板材间缝隙,打注硅酮耐候密封胶,最终完成整体装配式幕墙的施工,交付验收使用。施工方法适用于主要适用于超高、超难、大跨度及其施工周期短的建筑幕墙场所。
Fabricated curtain wall overall lifting installation construction method based on BIM model construction technical support
一种基于BIM模型构建技术支撑的装配式幕墙整体提升安装施工方法
TONG KELONG (Autor:in) / FENG GUOSEN (Autor:in) / SHI ZONGTAO (Autor:in)
09.02.2021
Patent
Elektronische Ressource
Chinesisch
Simple lifting device for fabricated curtain wall construction
Europäisches Patentamt | 2024
|