Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated building wallboard hoisting device
The invention discloses a fabricated building wallboard hoisting device. The fabricated building wallboard hoisting device comprises a fixing base, two supporting plates are symmetrically welded to the upper surface of the fixing base, grooves are formed in the adjacent sides of the two supporting plates, first plate bodies are slidably connected into the grooves, and a fourth plate body is weldedto one side of one of the supporting plates. When a wallboard is hoisted, a motor drives a rotating rod to rotate, the rotating rod drives a second board body to rotate, a first rod body can slide inside a fifth through groove, the second rod body rotates in a first through hole formed in one side of a hinge plate so that a hoisting structure can be moved out of the upper portion of the fixing base, the situation that a worker needs to place the wallboard below the device and then hoisting can be conducted is avoided, a first shell is pushed to move front and back, the first shell drives a U-shaped plate body to slide on the outer side wall of the first plate body, and the U-shaped plate body drives a sliding block to slide inside the sliding groove, so that the hoisting range of the device is enlarged, and the hoisting efficiency of the device is greatly improved.
本发明公开了一种装配式建筑墙板吊装装置,包括固定座,所述固定座的上表面对称焊接有两个支撑板,两个所述支撑板相邻的一侧均开设有凹槽,所述凹槽的内部滑动连接有第一板体,一个所述支撑板的一侧焊接有第四板体;在对墙板进行吊装时,电机带动转杆转动,转杆带动第二板体转动,第一杆体可以第五通槽的内部滑动,且第二杆体在铰接板一侧开设的第一通孔的内部转动,使得吊装结构能够移出固定座的上方,避免了需要工作人员将墙板放置在装置下方才可起吊的情况;推动第一壳体前后移动,第一壳体带动U形板体在第一板体的外侧壁滑动,U形板体带动滑块在滑槽的内部滑动,从而增加了装置吊装的范围,大大提高了装置的吊装效率。
Fabricated building wallboard hoisting device
The invention discloses a fabricated building wallboard hoisting device. The fabricated building wallboard hoisting device comprises a fixing base, two supporting plates are symmetrically welded to the upper surface of the fixing base, grooves are formed in the adjacent sides of the two supporting plates, first plate bodies are slidably connected into the grooves, and a fourth plate body is weldedto one side of one of the supporting plates. When a wallboard is hoisted, a motor drives a rotating rod to rotate, the rotating rod drives a second board body to rotate, a first rod body can slide inside a fifth through groove, the second rod body rotates in a first through hole formed in one side of a hinge plate so that a hoisting structure can be moved out of the upper portion of the fixing base, the situation that a worker needs to place the wallboard below the device and then hoisting can be conducted is avoided, a first shell is pushed to move front and back, the first shell drives a U-shaped plate body to slide on the outer side wall of the first plate body, and the U-shaped plate body drives a sliding block to slide inside the sliding groove, so that the hoisting range of the device is enlarged, and the hoisting efficiency of the device is greatly improved.
本发明公开了一种装配式建筑墙板吊装装置,包括固定座,所述固定座的上表面对称焊接有两个支撑板,两个所述支撑板相邻的一侧均开设有凹槽,所述凹槽的内部滑动连接有第一板体,一个所述支撑板的一侧焊接有第四板体;在对墙板进行吊装时,电机带动转杆转动,转杆带动第二板体转动,第一杆体可以第五通槽的内部滑动,且第二杆体在铰接板一侧开设的第一通孔的内部转动,使得吊装结构能够移出固定座的上方,避免了需要工作人员将墙板放置在装置下方才可起吊的情况;推动第一壳体前后移动,第一壳体带动U形板体在第一板体的外侧壁滑动,U形板体带动滑块在滑槽的内部滑动,从而增加了装置吊装的范围,大大提高了装置的吊装效率。
Fabricated building wallboard hoisting device
一种装配式建筑墙板吊装装置
WANG JUGUANG (Autor:in) / TAO JINPING (Autor:in) / QIU ZHIQIANG (Autor:in) / CHAI WEI (Autor:in) / LI YONGFENG (Autor:in) / SUI YANG (Autor:in) / WANG YOUSHENG (Autor:in)
12.02.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste