Guide frame fixing construction method
The invention provides a guide frame fixing construction method, and belongs to the technical field of guide frames. According to the fixing construction method, fixing is achieved through a lifting pile leg carried by the guide frame, the lifting of the pile leg mainly depends on mechanical driving, the fixing mode is simple and convenient, and the structure is stable. The guide frame fixing construction method comprises the following steps that the guide frame is accurately transported in place through positioning; the pile leg is lowered for multiple times through a lifting driving device until the pile leg is inserted into a water sediment layer; a platform is driven by the lifting driving device to climb along the pile leg multiple times until the platform is not affected by buoyancy,and in the climbing process of the platform, the pile leg is further pressed into the water sediment layer under the action of the gravity of the platform until stability is achieved; and the platform is driven by the lifting driving device to descend multiple times along the pile leg until reaching the platform using position.
本发明提出一种导向架的固定施工方法,属于导向架技术领域,其通过导向架本身搭载的升降桩腿实现固定,且桩腿的升降主要依靠机械驱动,固定方式简便,且结构稳定。该导向架的固定施工方法,包括如下步骤:通过定位将导向架精确运输到位;通过升降驱动装置多次下放桩腿,直至桩腿插入水底泥层;通过升降驱动装置驱动平台沿桩腿多次爬升,直至平台不受浮力作用,在平台爬升过程中,桩腿在平台重力作用下进一步压入水底泥层直至稳定;通过升降驱动装置驱动平台沿桩腿多次下降,直至到达平台使用位置。
Guide frame fixing construction method
The invention provides a guide frame fixing construction method, and belongs to the technical field of guide frames. According to the fixing construction method, fixing is achieved through a lifting pile leg carried by the guide frame, the lifting of the pile leg mainly depends on mechanical driving, the fixing mode is simple and convenient, and the structure is stable. The guide frame fixing construction method comprises the following steps that the guide frame is accurately transported in place through positioning; the pile leg is lowered for multiple times through a lifting driving device until the pile leg is inserted into a water sediment layer; a platform is driven by the lifting driving device to climb along the pile leg multiple times until the platform is not affected by buoyancy,and in the climbing process of the platform, the pile leg is further pressed into the water sediment layer under the action of the gravity of the platform until stability is achieved; and the platform is driven by the lifting driving device to descend multiple times along the pile leg until reaching the platform using position.
本发明提出一种导向架的固定施工方法,属于导向架技术领域,其通过导向架本身搭载的升降桩腿实现固定,且桩腿的升降主要依靠机械驱动,固定方式简便,且结构稳定。该导向架的固定施工方法,包括如下步骤:通过定位将导向架精确运输到位;通过升降驱动装置多次下放桩腿,直至桩腿插入水底泥层;通过升降驱动装置驱动平台沿桩腿多次爬升,直至平台不受浮力作用,在平台爬升过程中,桩腿在平台重力作用下进一步压入水底泥层直至稳定;通过升降驱动装置驱动平台沿桩腿多次下降,直至到达平台使用位置。
Guide frame fixing construction method
导向架的固定施工方法
LIU DEJIN (Autor:in) / WANG XIANG (Autor:in) / JU PENG (Autor:in) / FENG JIAXIN (Autor:in) / WANG MINGYU (Autor:in) / WANG CHUANPENG (Autor:in)
19.02.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Europäisches Patentamt | 2021
|Guide rail frame, guide rail fixing device and guide rail system
Europäisches Patentamt | 2020
|Grounding bolt fixing frame and construction method thereof
Europäisches Patentamt | 2024
|Guide pipe frame, guide pipe frame foundation platform and guide pipe frame construction method