Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction device and method for solving bumping at bridgehead
The invention discloses a construction device and method for solving bumping at bridgehead, and the method comprises the steps: carrying out the embankment material selection and analysis, foundationclearing, survey setting-out, rolling compaction experiment and embankment material filling according to the properties of different soil layers and design requirements in a roadbed filling process, and carrying out the compaction through a first tamping assembly, thereby completing the filling of each layer. After the compaction regulation is met, the upper layer of filling is carried out so thatthe roadbed fills into a whole with high strength, low compression, high impermeability and good stability, sedimentation is effectively reduced, and roadbed reinforcement is carried out to treat bumping at the bridgehead.
本发明公开了一种用于解决桥头跳车的施工装置及方法,在填筑路基过程中,依据不同土层性质及设计要求进行筑堤材料选择分析、清基、测量放样、碾压实验、堤料填筑以及利用所述第一夯实组件进行压实,完成每一层填筑,当符合压实规定后进行上一层填筑,从而将路基填筑成一个强度高、压缩低、抗渗性高以及稳定性好的整体,有效减少沉降,进行路基加固以治理桥头跳车。
Construction device and method for solving bumping at bridgehead
The invention discloses a construction device and method for solving bumping at bridgehead, and the method comprises the steps: carrying out the embankment material selection and analysis, foundationclearing, survey setting-out, rolling compaction experiment and embankment material filling according to the properties of different soil layers and design requirements in a roadbed filling process, and carrying out the compaction through a first tamping assembly, thereby completing the filling of each layer. After the compaction regulation is met, the upper layer of filling is carried out so thatthe roadbed fills into a whole with high strength, low compression, high impermeability and good stability, sedimentation is effectively reduced, and roadbed reinforcement is carried out to treat bumping at the bridgehead.
本发明公开了一种用于解决桥头跳车的施工装置及方法,在填筑路基过程中,依据不同土层性质及设计要求进行筑堤材料选择分析、清基、测量放样、碾压实验、堤料填筑以及利用所述第一夯实组件进行压实,完成每一层填筑,当符合压实规定后进行上一层填筑,从而将路基填筑成一个强度高、压缩低、抗渗性高以及稳定性好的整体,有效减少沉降,进行路基加固以治理桥头跳车。
Construction device and method for solving bumping at bridgehead
一种用于解决桥头跳车的施工装置及方法
LEI YUN (Autor:in) / LIU CHONG (Autor:in) / XIAO GUIYUAN (Autor:in) / YANG YANJUN (Autor:in) / LIU XUECAI (Autor:in)
23.02.2021
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Bridgehead roadbed composite structure for preventing bumping at bridgehead and construction method
Europäisches Patentamt | 2022
|Construction device and method for treating bumping at bridgehead
Europäisches Patentamt | 2021
|Butt strap structure construction method for bridgehead bumping
Europäisches Patentamt | 2020
|