The invention discloses a municipal building construction method. The municipal building construction method comprises the following steps that S01, longitudinal and transverse axes are measured according to axis control points and standard points submitted by a construction unit, a measurement control network is established, guide piles are set, and plane control axes are arranged; and S02, preparation before construction is carried out, mechanical earth cutting is carried out after construction preparation is finished, foundation construction is carried out under the ground of +/-0.000, an established control network point is used as the basis of foundation construction lofting, a first-stage control network point is used as the basis for verification, and through main body paying-off positioning, original axis position rechecking and correcting and original coordinate axis standard point correcting, the foundation construction lofting is completed, the original point is reset correctly, and the axis direction is closed. The method has the beneficial effects that the control points are delivered to the floor layer by layer through cooperation of a laser plumb aligner and a theodolite, and compared with a traditional layer-by-layer measurement and inspection mode, the method is faster and more efficient.
本发明公开了一种市政建筑楼宇建筑方法,楼宇建筑方法包括如下步骤:S01:根据建设单位提交的轴线控制点和水准点,测定出纵横的各轴线,建立测量控制网,设置引桩后进行平面控制轴线的布设;S02:进行施工前的准备,施工准备结束后进行机械挖土,再在±0.000地下做基础施工,利用已建立的控制网点作为基础施工放样的依据,利用首级控制网点为依据进行核验,通过主体放线定位,对原轴线位置进行复核、校对,对原坐标轴水准点进行校对,使原点复位正确,轴线方位闭合;本发明的有益效果是:通过激光铅直仪和经纬仪配合将控制点逐层投递到楼层,相较于传统逐层测量检验方式更加快捷高效。
The invention discloses a municipal building construction method. The municipal building construction method comprises the following steps that S01, longitudinal and transverse axes are measured according to axis control points and standard points submitted by a construction unit, a measurement control network is established, guide piles are set, and plane control axes are arranged; and S02, preparation before construction is carried out, mechanical earth cutting is carried out after construction preparation is finished, foundation construction is carried out under the ground of +/-0.000, an established control network point is used as the basis of foundation construction lofting, a first-stage control network point is used as the basis for verification, and through main body paying-off positioning, original axis position rechecking and correcting and original coordinate axis standard point correcting, the foundation construction lofting is completed, the original point is reset correctly, and the axis direction is closed. The method has the beneficial effects that the control points are delivered to the floor layer by layer through cooperation of a laser plumb aligner and a theodolite, and compared with a traditional layer-by-layer measurement and inspection mode, the method is faster and more efficient.
本发明公开了一种市政建筑楼宇建筑方法,楼宇建筑方法包括如下步骤:S01:根据建设单位提交的轴线控制点和水准点,测定出纵横的各轴线,建立测量控制网,设置引桩后进行平面控制轴线的布设;S02:进行施工前的准备,施工准备结束后进行机械挖土,再在±0.000地下做基础施工,利用已建立的控制网点作为基础施工放样的依据,利用首级控制网点为依据进行核验,通过主体放线定位,对原轴线位置进行复核、校对,对原坐标轴水准点进行校对,使原点复位正确,轴线方位闭合;本发明的有益效果是:通过激光铅直仪和经纬仪配合将控制点逐层投递到楼层,相较于传统逐层测量检验方式更加快捷高效。
Municipal building construction method
一种市政建筑楼宇建筑方法
HAN RUI (Autor:in)
26.02.2021
Patent
Elektronische Ressource
Chinesisch
Cross beam for municipal building construction and construction method
Europäisches Patentamt | 2021
|Municipal building engineering construction management system
Europäisches Patentamt | 2023
|Combined building wallboard for municipal construction
Europäisches Patentamt | 2023
|