Pouring foam sandwich thermal insulation wall with reserved door and window hole and production process of pouring foam sandwich thermal insulation wall
The invention discloses a pouring foam sandwich thermal insulation wall with a reserved door and window hole and a production process of the pouring foam sandwich thermal insulation wall. The thermalinsulation wall comprises an outer wallboard, an inner wallboard and polyurethane foam, the outer wallboard is fixed on an overhanging keel, and the inner wallboard is fixed on an inner keel; and an energy-saving auxiliary frame is arranged at the reserved door and window hole in the wall body. The production process comprises the steps that the overhanging keel extends out of the outdoor side ofa building beam, the inner keel is arranged on a building column, and a frame body defined by stand columns and transverse rods serves as an auxiliary frame installation foundation; the energy-savingauxiliary frame is installed in the frame body defined by the stand columns and the transverse rods, it is guaranteed that the inner side of the auxiliary frame is flush with the inner sides of the stand columns, and the outer side of the auxiliary frame is higher than the stand columns; the outer wallboard is installed on the overhanging keel and the transverse rods, and heat insulation cushion blocks are cushioned between the outer wallboard and the overhanging keel and between the outer wallboard and the transverse rods; the inner wallboard is installed on the inner keel, and the polyurethane foam is poured into a cavity between the inner wallboard and the outer wallboard; and the two wallboards are not directly connected, so that the influence of a cold bridge generated by a connectingpoint on the thermal insulation of the whole wall body is avoided.
本发明公开了一种预留门窗洞口的灌注泡沫夹心保温墙及其生产工艺。所述保温墙包括外页墙板、内页墙板及聚氨酯泡沫,外页墙板固定于外挑龙骨上,内页墙板固定于内龙骨上;所述墙体上的预留门窗洞口处设有节能附框。生产工艺为:在建筑梁靠室外侧上伸出外挑龙骨,在建筑柱上设置内龙骨,立柱和横杆围成的框体为附框安装基础;将节能附框安装于立柱和横杆围成的框体内,保证附框内侧与立柱内侧平齐,外侧挑出立柱;将外页墙板安装在外挑龙骨和横杆上,外页墙板与外挑龙骨和横杆之间垫隔热垫块;在内龙骨上安装内页墙板,在该层与外页墙板之间的空腔内灌注聚氨酯泡沫。两页墙板间不直接连接,避免了连接点产生的冷桥对整个墙体保温产生影响。
Pouring foam sandwich thermal insulation wall with reserved door and window hole and production process of pouring foam sandwich thermal insulation wall
The invention discloses a pouring foam sandwich thermal insulation wall with a reserved door and window hole and a production process of the pouring foam sandwich thermal insulation wall. The thermalinsulation wall comprises an outer wallboard, an inner wallboard and polyurethane foam, the outer wallboard is fixed on an overhanging keel, and the inner wallboard is fixed on an inner keel; and an energy-saving auxiliary frame is arranged at the reserved door and window hole in the wall body. The production process comprises the steps that the overhanging keel extends out of the outdoor side ofa building beam, the inner keel is arranged on a building column, and a frame body defined by stand columns and transverse rods serves as an auxiliary frame installation foundation; the energy-savingauxiliary frame is installed in the frame body defined by the stand columns and the transverse rods, it is guaranteed that the inner side of the auxiliary frame is flush with the inner sides of the stand columns, and the outer side of the auxiliary frame is higher than the stand columns; the outer wallboard is installed on the overhanging keel and the transverse rods, and heat insulation cushion blocks are cushioned between the outer wallboard and the overhanging keel and between the outer wallboard and the transverse rods; the inner wallboard is installed on the inner keel, and the polyurethane foam is poured into a cavity between the inner wallboard and the outer wallboard; and the two wallboards are not directly connected, so that the influence of a cold bridge generated by a connectingpoint on the thermal insulation of the whole wall body is avoided.
本发明公开了一种预留门窗洞口的灌注泡沫夹心保温墙及其生产工艺。所述保温墙包括外页墙板、内页墙板及聚氨酯泡沫,外页墙板固定于外挑龙骨上,内页墙板固定于内龙骨上;所述墙体上的预留门窗洞口处设有节能附框。生产工艺为:在建筑梁靠室外侧上伸出外挑龙骨,在建筑柱上设置内龙骨,立柱和横杆围成的框体为附框安装基础;将节能附框安装于立柱和横杆围成的框体内,保证附框内侧与立柱内侧平齐,外侧挑出立柱;将外页墙板安装在外挑龙骨和横杆上,外页墙板与外挑龙骨和横杆之间垫隔热垫块;在内龙骨上安装内页墙板,在该层与外页墙板之间的空腔内灌注聚氨酯泡沫。两页墙板间不直接连接,避免了连接点产生的冷桥对整个墙体保温产生影响。
Pouring foam sandwich thermal insulation wall with reserved door and window hole and production process of pouring foam sandwich thermal insulation wall
一种预留门窗洞口的灌注泡沫夹心保温墙及其生产工艺
SUN SHENGGEN (Autor:in) / SUN WEIHUA (Autor:in) / XU WEI (Autor:in)
26.02.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E06B
Feste oder bewegliche Abschlüsse für Öffnungen in Bauwerken, Fahrzeugen, Zäunen oder ähnlichen Einfriedungen allgemein, z.B. Türen, Fenster, Läden, Tore
,
FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES, OR LIKE ENCLOSURES, IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
Europäisches Patentamt | 2023
|Connecting assembly for sandwich thermal insulation wall and sandwich thermal insulation wall
Europäisches Patentamt | 2022
|Thermal insulation integrated double-wall simultaneous pouring device
Europäisches Patentamt | 2024
|Basement outer wall reserved hole pouring construction method
Europäisches Patentamt | 2024
|