Concrete bridge supporting column construction operation method
The invention provides a concrete bridge supporting column construction operation method. The concrete bridge supporting column construction operation method adopts the following equipment for construction, the equipment comprises a lower mold, an upper mold, a connecting piece and a demolding device, the lower end of the lower mold is installed on the existing ground, the upper mold is arranged above the lower mold, the connecting piece is mounted between the upper end of the lower mold and the lower end of the upper mold, and the demolding device is arranged at the left side of the upper mold. Through mutual cooperation of a first motor, a rotating shaft, a rotating rod and a rolling wheel, the rolling wheel can synchronously rotate on the edge of a disc, the rolling wheel, an L-shaped column, smf a hinge rod and a lug base are matched with one another, so the lug base pulls the arc-shaped block to disassemble the upper mold, the function of rapidly disassembling the upper mold can be achieved without manual work, and then the efficiency of construction operation of the concrete bridge supporting rod and the safety degree of the construction process can be improved.
本发明提供了一种混凝土桥梁支撑柱施工作业方法,该混凝土桥梁支撑杆施工作业方法采用如下设备进行施工,该设备包括下模具、上模具、连接件和脱模装置,所述的下模具的下端安装于已有地面上,下模具的上方设置有上模具,下模具的上端与上模具的下端之间安装有连接件,上模具的左侧设置有脱模装置,本发明能够通过一号电机、转轴、转动杆和滚动轮之间的相互配合,使滚动轮于圆盘的边缘同步旋转,滚动轮、L型柱、铰接杆和耳座相互配合,使耳座拉动弧形块从而将上模具进行拆分,无需人工便可实现快速拆离上模具的功能,进而可提高混凝土桥梁支撑杆施工作业的效率以及施工过程的安全程度。
Concrete bridge supporting column construction operation method
The invention provides a concrete bridge supporting column construction operation method. The concrete bridge supporting column construction operation method adopts the following equipment for construction, the equipment comprises a lower mold, an upper mold, a connecting piece and a demolding device, the lower end of the lower mold is installed on the existing ground, the upper mold is arranged above the lower mold, the connecting piece is mounted between the upper end of the lower mold and the lower end of the upper mold, and the demolding device is arranged at the left side of the upper mold. Through mutual cooperation of a first motor, a rotating shaft, a rotating rod and a rolling wheel, the rolling wheel can synchronously rotate on the edge of a disc, the rolling wheel, an L-shaped column, smf a hinge rod and a lug base are matched with one another, so the lug base pulls the arc-shaped block to disassemble the upper mold, the function of rapidly disassembling the upper mold can be achieved without manual work, and then the efficiency of construction operation of the concrete bridge supporting rod and the safety degree of the construction process can be improved.
本发明提供了一种混凝土桥梁支撑柱施工作业方法,该混凝土桥梁支撑杆施工作业方法采用如下设备进行施工,该设备包括下模具、上模具、连接件和脱模装置,所述的下模具的下端安装于已有地面上,下模具的上方设置有上模具,下模具的上端与上模具的下端之间安装有连接件,上模具的左侧设置有脱模装置,本发明能够通过一号电机、转轴、转动杆和滚动轮之间的相互配合,使滚动轮于圆盘的边缘同步旋转,滚动轮、L型柱、铰接杆和耳座相互配合,使耳座拉动弧形块从而将上模具进行拆分,无需人工便可实现快速拆离上模具的功能,进而可提高混凝土桥梁支撑杆施工作业的效率以及施工过程的安全程度。
Concrete bridge supporting column construction operation method
一种混凝土桥梁支撑柱施工作业方法
PAN LINFEI (Autor:in)
09.03.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Stiff concrete column supporting structure and stiffness concrete column construction method
Europäisches Patentamt | 2024
|Device for bridge supporting column construction and construction process
Europäisches Patentamt | 2020
|Polygonal concrete frame column formwork supporting construction method
Europäisches Patentamt | 2021
|Concrete latticed column supporting structure and construction method
Europäisches Patentamt | 2024
|Supporting column pouring formwork for building bridge construction
Europäisches Patentamt | 2021
|