High-pier hydraulic jacking integral type steel frame platform rollover construction system and construction method
The invention provides a high-pier hydraulic jacking integral type steel frame platform turnover construction system and a construction method. The construction system comprises a hydraulic jacking system, a steel frame platform system, a formwork and a formwork lifting system. The hydraulic jacking system comprises a supporting rod, a lifting frame, a hydraulic center hole jack and the like. Thehydraulic center hole jack is clamped on the supporting rod and climbs along the supporting rod. The steel frame platform system, the lifting frame and the hydraulic center hole jack are connected into a whole and ascend and descend synchronously. A plurality of sets of detachably connected supporting rods are arranged between the steel frame platform system and the formwork, when the supporting rods are locked and connected, the steel frame platform system and the formwork are synchronously lifted by the hydraulic center hole jack, when connection of the supporting rods is released, positionlocking of the steel frame platform system and the formwork is released, and lifting of the formwork is controlled by an electric hoist. The steel frame platform system and the formwork are lifted step by step, safety is high, construction efficiency is high, and the system is quite suitable for high pier construction.
本发明提供了一种高墩液压顶升整体式钢架平台翻模施工系统及施工方法,该施工系统包括液压顶升系统、钢架平台系统、模板及模板提升系统。液压顶升系统包括支撑杆、提升架、液压穿心千斤顶等,液压穿心千斤顶夹持在支撑杆上并沿支撑杆爬升;钢架平台系统与提升架、液压穿心千斤顶连接成一体并同步升降;钢架平台系统与模板之间设有多组可拆卸连接的撑杆,当撑杆锁定连接时,钢架平台系统与模板被液压穿心千斤顶同步提升,当解除撑杆的连接时,钢架平台系统与模板的位置锁定被解除,模板的提升受电动葫芦的控制。对钢架平台系统和模板分步提升,安全性高,施工效率高,非常适合高墩施工。
High-pier hydraulic jacking integral type steel frame platform rollover construction system and construction method
The invention provides a high-pier hydraulic jacking integral type steel frame platform turnover construction system and a construction method. The construction system comprises a hydraulic jacking system, a steel frame platform system, a formwork and a formwork lifting system. The hydraulic jacking system comprises a supporting rod, a lifting frame, a hydraulic center hole jack and the like. Thehydraulic center hole jack is clamped on the supporting rod and climbs along the supporting rod. The steel frame platform system, the lifting frame and the hydraulic center hole jack are connected into a whole and ascend and descend synchronously. A plurality of sets of detachably connected supporting rods are arranged between the steel frame platform system and the formwork, when the supporting rods are locked and connected, the steel frame platform system and the formwork are synchronously lifted by the hydraulic center hole jack, when connection of the supporting rods is released, positionlocking of the steel frame platform system and the formwork is released, and lifting of the formwork is controlled by an electric hoist. The steel frame platform system and the formwork are lifted step by step, safety is high, construction efficiency is high, and the system is quite suitable for high pier construction.
本发明提供了一种高墩液压顶升整体式钢架平台翻模施工系统及施工方法,该施工系统包括液压顶升系统、钢架平台系统、模板及模板提升系统。液压顶升系统包括支撑杆、提升架、液压穿心千斤顶等,液压穿心千斤顶夹持在支撑杆上并沿支撑杆爬升;钢架平台系统与提升架、液压穿心千斤顶连接成一体并同步升降;钢架平台系统与模板之间设有多组可拆卸连接的撑杆,当撑杆锁定连接时,钢架平台系统与模板被液压穿心千斤顶同步提升,当解除撑杆的连接时,钢架平台系统与模板的位置锁定被解除,模板的提升受电动葫芦的控制。对钢架平台系统和模板分步提升,安全性高,施工效率高,非常适合高墩施工。
High-pier hydraulic jacking integral type steel frame platform rollover construction system and construction method
一种高墩液压顶升整体式钢架平台翻模施工系统及施工方法
RONG JINGSONG (Autor:in) / WANG YINBIAO (Autor:in) / ZHUANG HONGBIN (Autor:in) / GUAN BINFENG (Autor:in) / ZHANG JIEHUA (Autor:in) / CHEN MING (Autor:in) / LI SHAOLIANG (Autor:in) / YANG ZHENG (Autor:in) / CHEN ZHONGLUE (Autor:in) / HUANG GUOZHONG (Autor:in)
09.03.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Hydraulic jacking integral type steel frame platform and rollover construction method thereof
Europäisches Patentamt | 2023
|Sliding and lifting frame for high pier column rollover construction
Europäisches Patentamt | 2020
|Bridge high pier rollover synchronous construction method
Europäisches Patentamt | 2021
|WALKING-TYPE BRIDGE THIN-WALL PIER HIGH-PIER JACKING FORMWORK AND CONSTRUCTION METHOD THEREFOR
Europäisches Patentamt | 2023
|Railway integral type jacking frame interchange system and construction method thereof
Europäisches Patentamt | 2022
|