Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of polyurethane thermal insulation layer
The invention provides a construction method of a foamed polyurethane thermal insulation layer, and belongs to the field of building construction. The construction method particularly comprises the following steps of 1, manufacturing an outer plate; 2, manufacturing a fixing device; 3, manufacturing a pre-spraying outer plate; 4, pouring on site; and 5, sealing seams. According to the method, a hook connecting rod is used to fix the outer plate is fixed to a wall body on the premise that the wall body is not damaged, polyurethane is poured into a cavity formed by the outer plate and the wall body in a stacked mode, pressure force brought by foaming deformation of the polyurethane is buffered and borne by flexible foam polyurethane pre-sprayed on the outer plate, the outer plate is light and thin, selectable materials are rich, a wall is not damaged in the construction process, construction is easy, so that method is particularly suitable for high-rise operation.
本发明提供一种发泡聚氨酯保温层施工方法,属于建筑施工领域,具体的,通过以下步骤进行:1)制作外板;2)制作固定装置;3)制作预喷涂外板;4)现场浇注;5)封缝。本发明使用挂钩连接杆,在不破坏墙体的前题下,将外板固定在墙体上。向外板和墙体形成的空腔层叠浇注聚氨酯,聚氨酯发泡形变带来的压迫力,由预喷涂在外板上的软泡发泡聚氨酯缓冲承担。本发明的外板轻薄,可选材料丰富,施工过程不破坏墙体,施工简单,尤其适合高层作业。
Construction method of polyurethane thermal insulation layer
The invention provides a construction method of a foamed polyurethane thermal insulation layer, and belongs to the field of building construction. The construction method particularly comprises the following steps of 1, manufacturing an outer plate; 2, manufacturing a fixing device; 3, manufacturing a pre-spraying outer plate; 4, pouring on site; and 5, sealing seams. According to the method, a hook connecting rod is used to fix the outer plate is fixed to a wall body on the premise that the wall body is not damaged, polyurethane is poured into a cavity formed by the outer plate and the wall body in a stacked mode, pressure force brought by foaming deformation of the polyurethane is buffered and borne by flexible foam polyurethane pre-sprayed on the outer plate, the outer plate is light and thin, selectable materials are rich, a wall is not damaged in the construction process, construction is easy, so that method is particularly suitable for high-rise operation.
本发明提供一种发泡聚氨酯保温层施工方法,属于建筑施工领域,具体的,通过以下步骤进行:1)制作外板;2)制作固定装置;3)制作预喷涂外板;4)现场浇注;5)封缝。本发明使用挂钩连接杆,在不破坏墙体的前题下,将外板固定在墙体上。向外板和墙体形成的空腔层叠浇注聚氨酯,聚氨酯发泡形变带来的压迫力,由预喷涂在外板上的软泡发泡聚氨酯缓冲承担。本发明的外板轻薄,可选材料丰富,施工过程不破坏墙体,施工简单,尤其适合高层作业。
Construction method of polyurethane thermal insulation layer
一种聚氨酯保温层施工方法
WANG YINGJUN (Autor:in) / LI XU (Autor:in) / CHEN DAOLI (Autor:in) / WANG JIANSHENG (Autor:in) / QIAO HUI (Autor:in) / CHEN JIANZHEN (Autor:in) / YAN LUBO (Autor:in) / GUO YIMING (Autor:in) / WANG FAN (Autor:in) / HU RUICHENG (Autor:in)
09.03.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Construction method for controlling spraying thickness of polyurethane thermal insulation layer
Europäisches Patentamt | 2024
|Cold storage polyurethane spraying thermal insulation construction method
Europäisches Patentamt | 2024
|Rigid polyurethane thermal insulation layer spraying structure and method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|Polyurethane spraying device and method for cold storage thermal insulation layer
Europäisches Patentamt | 2023
|