Sluice gate opening-closing water diversion and drainage device for hydropower engineering and implementation method
The invention discloses a sluice gate opening-closing water diversion and drainage device for hydropower engineering and an implementation method, and belongs to the technical field of sluice gate opening-closing water diversion and drainage. The sluice gate opening-closing water diversion and drainage device comprises a sluice gate assembly, a left side barrier gate edge and a right side barriergate edge, the left side of the sluice gate assembly is slidably connected with the left side barrier gate edge, the right side of the sluice gate assembly is slidably connected with the right side barrier gate edge, lateral drainage outer water gaps are formed in the outer side walls of the left side barrier gate edge and the right side barrier gate edge, sliding grooves are formed in the inner side walls of the left side barrier gate edge and the right side barrier gate edge, the sluice gate assembly comprises a main gate and an auxiliary gate, and one side of the main gate is slidably connected with the auxiliary gate. Three-direction water diversion and drainage is achieved, the water diversion and drainage efficiency is improved, a lifting assembly can be used for driving the auxiliary gate to move up and down along the main gate, the auxiliary gate can adjust the height position of each water gap along the height of the water level, the water pressure difference caused by the height during water diversion and drainage is reduced, and water flow at a water gate opening is purified.
本发明公开了水电工程用水闸门开合分流引水装置及实施方法,属于水闸门开合分流引水技术领域,包括水闸门总成、左侧道闸边和右侧道闸边,所述水闸门总成的左侧滑动连接有左侧道闸边,所述水闸门总成的右侧滑动连接有右侧道闸边,所述左侧道闸边和右侧道闸边的外侧壁上均开设有侧向引流外水口,左侧道闸边和右侧道闸边的内侧壁上开设有滑槽,所述水闸门总成包括主闸门和副闸门,所述主闸门的一侧滑动连接有副闸门。实现三向分流引水,提高分流引水的效率,利用升降组件能够带动副闸门沿主闸门上下移动,副闸门能够沿水位的高度调节各个水口的高度位置,降低分流引水时由高度引起的水压差,净化水闸口处的水流。
Sluice gate opening-closing water diversion and drainage device for hydropower engineering and implementation method
The invention discloses a sluice gate opening-closing water diversion and drainage device for hydropower engineering and an implementation method, and belongs to the technical field of sluice gate opening-closing water diversion and drainage. The sluice gate opening-closing water diversion and drainage device comprises a sluice gate assembly, a left side barrier gate edge and a right side barriergate edge, the left side of the sluice gate assembly is slidably connected with the left side barrier gate edge, the right side of the sluice gate assembly is slidably connected with the right side barrier gate edge, lateral drainage outer water gaps are formed in the outer side walls of the left side barrier gate edge and the right side barrier gate edge, sliding grooves are formed in the inner side walls of the left side barrier gate edge and the right side barrier gate edge, the sluice gate assembly comprises a main gate and an auxiliary gate, and one side of the main gate is slidably connected with the auxiliary gate. Three-direction water diversion and drainage is achieved, the water diversion and drainage efficiency is improved, a lifting assembly can be used for driving the auxiliary gate to move up and down along the main gate, the auxiliary gate can adjust the height position of each water gap along the height of the water level, the water pressure difference caused by the height during water diversion and drainage is reduced, and water flow at a water gate opening is purified.
本发明公开了水电工程用水闸门开合分流引水装置及实施方法,属于水闸门开合分流引水技术领域,包括水闸门总成、左侧道闸边和右侧道闸边,所述水闸门总成的左侧滑动连接有左侧道闸边,所述水闸门总成的右侧滑动连接有右侧道闸边,所述左侧道闸边和右侧道闸边的外侧壁上均开设有侧向引流外水口,左侧道闸边和右侧道闸边的内侧壁上开设有滑槽,所述水闸门总成包括主闸门和副闸门,所述主闸门的一侧滑动连接有副闸门。实现三向分流引水,提高分流引水的效率,利用升降组件能够带动副闸门沿主闸门上下移动,副闸门能够沿水位的高度调节各个水口的高度位置,降低分流引水时由高度引起的水压差,净化水闸口处的水流。
Sluice gate opening-closing water diversion and drainage device for hydropower engineering and implementation method
水电工程用水闸门开合分流引水装置及实施方法
ZHANG JING (Autor:in)
12.03.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau